Book contents
- Frontmatter
- Contents
- List of Illustrations
- Foreword
- Preface
- Chapter 1 Introduction
- Chapter 2 The Human Factor
- Chapter 3 Organisation
- Chapter 4 Urban Planning
- Chapter 5 Project Management
- Chapter 6 Housing
- Chapter 7 The Work of Technisches Hilfswerk in Housing Repair
- Chapter 8 Health, Education and Other Building Projects
- Chapter 9 Demolition
- Chapter 10 Construction Industry Recovery
- Chapter 11 Urban Infrastructure
- Chapter 12 Conclusions
- Appendix 1 Project Schedules
- Appendix 2 Department Staff Listing
- Bibliography
- Illustrations
Chapter 9 - Demolition
- Frontmatter
- Contents
- List of Illustrations
- Foreword
- Preface
- Chapter 1 Introduction
- Chapter 2 The Human Factor
- Chapter 3 Organisation
- Chapter 4 Urban Planning
- Chapter 5 Project Management
- Chapter 6 Housing
- Chapter 7 The Work of Technisches Hilfswerk in Housing Repair
- Chapter 8 Health, Education and Other Building Projects
- Chapter 9 Demolition
- Chapter 10 Construction Industry Recovery
- Chapter 11 Urban Infrastructure
- Chapter 12 Conclusions
- Appendix 1 Project Schedules
- Appendix 2 Department Staff Listing
- Bibliography
- Illustrations
Summary
Note by John Yarwood
Central Mostar was a devastated area in 1994. As soon as possible, I invited five specialised consultancy firms to make a submission covering their track-record and approach. In the conditions obtaining, a quick decision was needed and I chose the Danish firm DEMEX, which was managed by a leading demolition and recycling expert, Erik Lauritzen. He proposed a partnership with a structural engineering firm, Rambøll, Hanneman and Højlund. After negotiation we signed a consultancy contract in early 1995. The first problem was the lack of a legal basis for demolition work to buildings which we did not own. Usually, the ownership was in dispute between Croats and Muslims. A decree was drafted to give us the necessary powers, which was signed by the Administrator (after consultation and agreement from both sides) on 19 March 1995.
To set up a comprehensive contract would have taken a long time, so we pursued very quickly a small ‘emergency contract’ which was awarded to the Scandinavian Demolition Company after an international tender on rates.
The major contract (1995/96) followed on, and Niels Strufe describes this here. It had a tremendous impact on the appearance of the city. Streets had been blocked by masses of fallen masonry. Building interiors were full of rubble. The city was in a horrific mess. Afterwards, of course, ruins were still evident, but they were clean and orderly. Doors and windows were neatly closed, streets were clear, unstable walls were propped by timber scaffolds, and structures exposed to rain were protected from further deterioration.