Hostname: page-component-cd9895bd7-hc48f Total loading time: 0 Render date: 2024-12-25T19:32:38.453Z Has data issue: false hasContentIssue false

The Regulatory Framework and Sustainable Development of China's Electricity Sector*

Published online by Cambridge University Press:  08 June 2015

Yin-Fang Zhang*
Affiliation:
University of Manchester. Email: [email protected].
Rights & Permissions [Opens in a new window]

Abstract

Both supply- and demand-oriented solutions are important in cleaning up the electricity sector. However, their successful deployment calls for the removal of various barriers. This paper looks at China's electricity industry, one of the world's largest emitters of greenhouse gases, by relating the regulatory framework to the environmental dimension of sustainable electricity development. It develops an analytical framework by drawing upon the literature on the deployment of supply- and demand-side solutions, regulatory governance, and environmental policy integration. The paper finds that, in China's electricity sector, environmental considerations are subordinate to economic and development goals in policymaking and enforcement. Under the current regulatory framework, regulatory policies/instruments are not conducive to removing barriers to the effective deployment of the solutions.

摘要

解决电力行业的污染问题需要使用供给与需求双方面的措施。但是, 这些措施的成功使用面临许多障碍。本文将注意力放在中国的电力行业, 把该行业的监管体制与其在解决污染问题中所遇到的挑战和困难联系起来。分析中使用的理论框架取材于监管治理, 供需方减排措施, 及环境政策一体化方面的文献。分析结果表明, 在中国电力工业的政策制定与执行的过程中, 经济和发展目标是第一位, 而环境方面的考量处于从属地位。 目前的监管体制恰恰就是服务于这样一个决策定位。因此, 在这样的监管体制下所制定和采取的监管政策与手段不利于清除减排措施所面临的障碍。

Type
Articles
Copyright
Copyright © The China Quarterly 2015 

China's dependence on dirty energy to fuel its economic growth for the last 30 years raises concerns about whether the economy can make a transition towards more sustainable development. Nowhere does such a transition pose a greater challenge than in the coal-dependent electricity sector, which is responsible for 40 per cent of China's SO2 and approximately half of its energy-related CO2 emissions.Footnote 1 The key challenge is how to provide adequate power through an environmentally benign electricity sector.

Both supply- and demand-side solutions are crucial to achieving a “greener” electricity industry and involve the adoption of off-the-shelf technologies. However, owing to problems arising from the potential conflicts between environmental and sectoral objectives, the promise of new technologies is insufficient to guarantee their successful deployment.Footnote 2 Additional complexities may also arise in countries where the sector has undergone structural changes and regulatory reform, driven primarily by economic arguments. The body of empirical literature on the governance structure and process through which environmental concerns are addressed in the energy sector is growing, but it focuses mostly on developed countries.Footnote 3 This paper attempts to fill the gap by developing an analytical framework useful for understanding the practices of less developed countries, and applying it to the case of China, one of the world's largest emitters of greenhouse gases. The last three decades have witnessed much reform in China's electricity industry. However, although the number of studies on electricity reform is growing, not many have related the regulatory framework to environmental concerns in the sector.Footnote 4 This paper attempts to redress that omission. By applying the analytical framework, it examines the challenges arising from the regulatory framework to the deployment of supply- and demand-side solutions in China's electricity sector.

This paper continues by setting out the analytical framework. Then, after an overview of China's electricity industry, section four relates the regulatory framework to various barriers to the deployment of supply- and demand-side solutions. Challenges in the adoption of pollution-control measures are discussed in the fifth section, and the last section concludes.

Analytical Framework

In this section, I develop an analytical framework and use it as a basis from which to discuss the challenges for cleaning up China's electricity industry. The framework draws from the literature on the deployment of supply- and demand-side solutions, regulatory governance, and environmental policy integration.

Barriers to the deployment of supply- and demand-side solutions

Publications by energy organizations have emphasized the importance of deploying supply- and demand-side solutions in cleaning up the electricity sector.Footnote 5 On the supply side, emissions from coal-fired generation can be reduced by closing down small generating units and replacing them with bigger, less polluting ones; using cleaner coal; or retrofitting coal-fired units with pollutant-capture equipment.Footnote 6 Environmental gains can be obtained by switching from coal to less polluting fuels, preferably from renewable sources, in electricity generation. In addition, pollution can be reduced by improving generation efficiency, as a given energy output could be produced by using less fuel.Footnote 7 Solutions on the demand side usually come under the name of demand-side management (DSM), which aims to contain electricity demand through “a structured means of promoting end-user energy efficiency (EE) and energy savings.”Footnote 8

However, various barriers may prevent the full realization of the potential gains from these solutions. Economic barriers relate to market distortions or market failure caused by high costs and externalities associated with the solutions. Replacing small coal-fired units with bigger ones, fitting pollutant-capture equipment and installing renewable capacity all require substantial upfront investment and the continuous injection of capital to cover operating costs, thus making such solutions less cost-competitive. However, cleaner plants carry positive externalities – less pollution. The cost disadvantages compared with the environmental benefits of the solutions represent a potential market failure, and so policies are necessary in order to create a level playing field for plants using different technologies. But, why do the environmental benefits lead to market failure? Apart from financial support, appropriate investment planning methodologies and licensing rules, price regulation, and dispatch arrangements are all essential to overcome the economic barriers.

Both investment planning methodologies and project approval rules affect the types of plant that are constructed. To lend support to cleaner plants/technologies, it is important for environmental costs and benefits to be integrated into the planning process for investment in generation capacity, and for environmental standards to be considered as one of the main criteria used in project approval.Footnote 9 On-grid electricity tariffs need to be set at a level to allow for the recovery of investment costs and to give recompense for the environmental benefits of cleaner plants and/or technologies. Price adjustment mechanisms such as emission charges can also be used as a cost adder to internalize pollution damage not fully reflected in electricity prices.Footnote 10 Appropriate pricing (probably together with the charging of emission fees) can increase the attractiveness of using cleaner plants to generate and dispatch power. This may be particularly important in an unbundled electricity industry where profit-driven power producers would otherwise make dispatch decisions based purely on the principle of cost efficiency: plants with low operating costs (but which tend to be dirtier) will be used more than those with high operating costs. To promote the development of renewables, price-based schemes are usually combined with quantity-based measures such as renewable portfolio standards, along with arrangements that ensure grid access and institute purchase obligations.Footnote 11

To improve generation efficiency, it is crucial that there are provisions in on-grid tariffs which incentivize power producers to adopt efficiency-enhancing practices.Footnote 12 Competition may also come into play by compelling incumbents to use inputs more efficiently.

On the demand side, bringing end-user electricity prices closer to the actual level of costs would give consumers the incentive to save energy and improve EE.Footnote 13 However, EE technologies often require high upfront capital and additional costs, while savings accrue over time and carry positive externalities.Footnote 14 To overcome the economic barrier associated with the public goods nature of EE technologies, the international practice is to direct EE incentives to households and firms through DSM programmes that are usually provided by grid companies.Footnote 15 To do so, there should be incentives for grid companies to invest in DSM programmes, usually through appropriate price regulation which allows for the recovery of costs.Footnote 16

Although pivotal for the effective deployment of demand- and supply-side solutions, the removal of economic barriers may require the elimination of non-economic obstacles,Footnote 17 which I categorize into institutional and structural barriers.Footnote 18 Structural barriers relate to the features of the industrial and corporate structure. In the generation sub-sector of an unbundled electricity industry, the dominance of the incumbents in plant development and generation can be seen as a structural barrier in that it may deter the entry of other players.Footnote 19 Policies to tackle this usually aim at breaking up this dominance and permitting independent power producers (IPPs). Such policies bring at least two potential environmental gains. First, they place incumbents under competitive pressure to improve generation efficiency. Second, they help to promote the development of renewables because, according to international organizations such as the World Bank, IPPs tend to be the main developers of renewable energy projects.

Another structural barrier in an unbundled electricity system is related to grid access. To encourage the development of renewables and IPPs, it is necessary to reduce the amount of discretion grid companies have over grid access by bringing them under the authority of the sector regulator.Footnote 20 Subjecting them to regulatory authority is also important for demand-side solutions in that it is a prerequisite for imposing incentive-based regulation and mandatory requirements for companies to invest in DSM programmes.

Institutional barriers refer to some features of the institutional structure which may hinder the deployment of effective solutions. The literature has emphasized that it is essential to improve institutions in order to overcome structural and economic barriers.Footnote 21 It is important to have in place the institutional arrangements by which transparent and clear price structures that reflect costs (including those associated with externalities) are set and enforced; investment projects are approved according to well-defined procedures in which environmental concerns are incorporated; and incumbents (particularly grid companies) are effectively regulated. Because tackling environmental issues in the sector involves diverse policy arenas, coordination mechanisms are needed for joint policymaking and priority setting among various agencies.Footnote 22

The policy prescriptions discussed above are largely normative. Practices adopted in the real world, in particular in developing and transitional economies (like China), will unsurprisingly deviate from the guidelines. To bring in positive elements that help to explain real-world practices as they occur, my analytical framework draws on the literature on regulatory governance and environmental policy integration.

Regulatory governance: an institutional perspective

The institutional perspective of regulation places emphasis on the institutional determinants of regulatory policy. Levy and Spiller have distinguished between regulatory governance and regulatory incentives.Footnote 23 Regulatory governance involves “the mechanisms that societies use to constrain regulatory discretion and to resolve conflicts that arise in relation to these constraints.”Footnote 24 Regulatory incentives are the effective rules derived from regulatory policies/instruments regarding pricing, subsidies, entry, interconnection, etc.

In general, a primary function of regulation in public utilities such as electricity is to address issues arising from the specific features of the industries – large sunk investments, economies of scale, and the mass consumption of products/services. Regulation seeks to allocate costs across producers and consumers in a way that maintains investors’ willingness to invest while minimizing the cost of service provisions.Footnote 25 It also seeks to achieve sectoral social objectives, such as universal service which emphasizes access to the product at affordable prices, an issue more pronounced in developing countries. Regulatory outcomes – in other words, how well the sectoral objectives are served – depend on the incentives formed by regulatory policies/instruments, which are in turn determined by the governance structure and process of rule-making and enforcement and their link to the underpinning institutional environment.Footnote 26 In regulated industries, various actors, including governments, regulatory agencies, and regulated firms, relate to one another within a broad institutional framework.Footnote 27 Regulatory regimes differ in the degree to which regulatory agencies are related to the government and other agencies, and how close regulatees are situated in the structure.Footnote 28 By analysing the institutional determinants of regulation, attention is paid not only to the formal attributes of the actors and their relations, but also to the informal distribution of power among them.Footnote 29 In other words, regulation can be analysed as the outcome of complex exchanges between the actors.Footnote 30

The literature on regulation and regulatory governance in public utilities is concerned mainly with the regulatory design through which sectoral objectives are addressed. However, there is another market failure in the electricity sector – environmental externalities – which also calls for regulatory intervention. Although environmental issues are traditionally addressed by environmental policy, there is a recognition that the environmental sector alone cannot secure environmental objectives and that non-environmental policy areas need to consider environmental effects.Footnote 31

Environmental policy integration

Integration of environmental concerns into other policy areas is referred to as environmental policy integration (EPI). There is no agreement on its definition or on how much weight environmental objectives should receive. A “strong” definition assigns principle priority to environmental considerations,Footnote 32 while a less “strong” view emphasizes the removal of contradictions between policies and a balanced approach towards environmental and energy-centred objectives.Footnote 33 Further down the spectrum is “weak” EPI, which argues for simply considering environmental concerns when formulating and enforcing policies in other sectors.Footnote 34

EPI is seen as not just a state of affairs, which is the aim of policymaking, but also as the process necessary to achieve change.Footnote 35 Two factors are important for understanding the process and outcomes of policy integration: functional overlap between environmental and other goals – whether they are synergistic or conflictive; and political commitment to environmental objectives. Together, these factors determine the position of environmental considerations in relation to sectoral and other objectives in policymaking and enforcement. Seeing EPI as a process is to take an institutional perspective and place emphasis on the institutional and policy contexts. This means focusing the analysis on the governing structure and process that take place inside political systems in which different actors interact and employ different combinations of policy instruments.Footnote 36

Towards an analytical framework

The analytical framework used in this paper is developed by combining the three blocks of literature discussed above. Guidelines issued by international energy organizations on how to overcome the barriers describe the desirable attributes of policies and institutions, but are largely normative. To understand actual practices adopted, the institutional perspective of regulation is brought in, which links policy outcomes with the institutional determinants of regulatory policy/instruments, thereby bringing regulatory governance into the discussion and highlighting its role in determining regulatory incentives. The literature on EPI is drawn upon to extend the analysis of regulatory governance to the governance structure and process through which environmental considerations are (or are not) integrated into sectoral policies. The policy outcome depends on whether the removal of the related barriers can be facilitated by regulatory incentives arising from the policies/instruments thus made and enforced in the sector.

When examining the outcome of integrating environmental and sectoral policies, it is useful to analyse functional overlap among various objectives and the political commitment to environmental considerations. The electricity sector is associated with multiple goals, including environmental and sectoral economic and social objectives. In addition, the industry carries development goals because of its key role in promoting economic growth in a country like China.Footnote 37 Given the mass consumption of electricity and the universal-service obligation, governments may intervene in the sector to win political support.Footnote 38 Note that what is referred to as governments includes both central and sub-national governments, as the latter play an important role in policymaking and enforcement in a country like China. Therefore, it is necessary to incorporate the misalignment of interests and priorities between governments at different levels into the analysis. As has been said, the extent to which different objectives are functionally synergistic or conflictive, together with governments’ commitment to environmental considerations, decides the priority order of various objectives in the policy process and affects the power distribution among various actors and the ways in which they interact with one another. It is where institutional barriers may arise, which may then result in the features of industrial and corporate structures that stand as structural barriers. Together, they will impact on what regulatory policies/instruments are adopted and how they are implemented in the sector. Whether the deployment of supply- and demand-side solutions will be facilitated depends on the extent to which the incentives from the policies/instruments and their enforcement are conducive to overcoming related economic barriers.

The following sections apply the analytical framework to China's electricity sector by analysing data collected from various sources. Second-hand data were collected from the websites and publications of regulatory agencies and government departments; reports in newspapers and magazines; the publications of international organizations and the academic literature on China's electricity industry. They were supplemented by data collected through individual interviews with officials at regulatory agencies and government departments, and researchers who have conducted extensive research in related areas (see Appendix for details). Data triangulation was used to provide cross-validity and to help reduce potential bias in individual data sources and informants. Based on information cross-checked among data sources, the regulatory framework is applied to the deployment of supply- and demand-side solutions in China.

Overview of China's Electricity Sector

Before 1997, China's electricity sector was vertically integrated and headed by the industry ministry. To combat severe power shortages, a policy was implemented in 1985 which granted provincial governments the authority to approve investment projects with a capacity of 50MW or below, and opened electricity generation to private investors. Consequently, local, small-scale power plants proliferated.Footnote 39

In 1997, the industry ministry was dissolved and the State Power Corporation (SPC) was established to oversee the business operations of the sector while the ministry's policymaking functions were transferred to the now-called National Development and Reform Commission (NDRC). In 2002, the SPC was unbundled into five national state-owned generating companies (the Big Five hereafter) and two grid companies. The Big Five, which controlled about half of China's total generation capacity, were expected to compete with one another and with other power producers.Footnote 40 The two grid companies owned over 90 per cent of the total transmission and distribution assets.

In 2003, the State Electricity Regulatory Commission (SERC) was established as the sector regulator and was mandated with wide-ranging statutory powers. However, the NDRC, the de facto chief regulator of the sector, still took the lead in two important policy areas – pricing and investment project approval. The price bureau of the NDRC and its local offices set electricity tariffs, and the NDRC's energy bureau and its provincial branches issued investment permits. In 2008, the energy bureau was reformed into the National Energy Administration (NEA), but remained under the jurisdiction of the NDRC. Footnote 41 The SERC was folded into the NEA in early 2013, with a proposal to completely dissolve the sector regulator. This change consolidated NDRC's authoritative grip over the power sector.

Other agencies involved in the regulatory structure include the State-owned Asset Supervision and Administration Commission (SASAC), which is responsible for managing the assets in state-owned electricity companies, and the Ministry of Environmental Protection (MEP), which is responsible for environmental issues in the sector.Footnote 42

Regulatory Framework of China's Electricity Sector and Barriers to Supply- and Demand-side Solutions

The analysis in this section draws mostly on the situation prior to the SERC being absorbed into the NEA; however, the argument based on the analytical framework can be readily extended to any changes thereafter. As the reduction of economic barriers first requires the removal of non-economic ones, the section begins with an examination of the extent to which the regulatory framework serves as an institutional barrier, and then moves on to structural and economic barriers.

Institutional barriers

Owing to its strategic importance, the electricity sector has been tightly controlled by the Chinese government.Footnote 43 It has been a political base for China's bureaucracies, with many Party and government leaders having roots in the industry.Footnote 44 This connection has ensured the sector's prime position in centrally made policies and, conversely, has made it easier for the government to maintain control over the industry. After the industry ministry was dissolved in 1997, authority for making sectoral policies remained with state commissions. This situation has not fundamentally changed, even with the establishment of the SERC, because the NDRC has maintained control over what really matters in the sector – pricing and investment approval. As the key bureaucratic arm of the Chinese Communist Party, the NDRC is responsible for formulating and implementing strategies for national economic development and for putting forward polices of macroeconomic management.Footnote 45 Electricity policies formed by the NDRC are integral parts of the national economic development plans, and ensuring an adequate electricity supply is their primary guideline.Footnote 46 Policies on end-user electricity prices formulated by the NDRC's price bureau serve the commission's function of overseeing general price stability and managing inflation.Footnote 47 It should be noted that such electricity policies may ultimately be intended to maintain political legitimacy, as inadequate energy supply and social instability are considered as serious threats to the economic interests of the country and therefore to the survival of the party-state.Footnote 48

As the sector regulator, the SERC has a nominal mandate to oversee competition and prevent market domination in electricity generation. In addition, it mediates and adjudicates disputes between power plants and grid companies over grid connection and access. However, its status has not been supported by law and, having no say in investment approval and electricity tariffs, it lacks the necessary regulatory power to deliver on its mandates.Footnote 49 Despite being called an “independent” regulator, its independence is questionable because of its industrial and political ties. When abolished in 1997, the industry ministry transferred its staff to the SPC (which was later unbundled into the Big Five and the grid companies), NDRC's energy bureau, and later to the SERC. Personnel continue to move between these organizations.Footnote 50

The MEP is supposed to play an important and primary role with regard to environmental issues. It is responsible for national environmental governance and participates in the formulation of plans associated with trans-boundary environmental problems.Footnote 51 According to the Environmental Protection Law, effective from 1989, environmental protection facilities must be concurrently designed, constructed and operated with all new power plant projects. The MEP has authority to withhold endorsement of any projects that fail to satisfy these requirements, and can suspend any project in the course of construction if it fails to comply with the law. However, the NDRC can approve power projects that do not meet environmental standards in the case of power shortages.Footnote 52

Each of these different agencies has been competing for rule ownership and policy formulation, with the NDRC appearing dominant in the game.Footnote 53 Nevertheless, there lacks coordination among different policy areas. According to the Supervision and Administration of the Power Industry Directive, enacted in 2005, the SERC is mandated to cooperate with the MEP to supervise the implementation of environmental regulations and standards in the sector. However, with no authority over pricing and investment approval, the SERC has no means to accomplish the coordination.Footnote 54

Another feature of the regulatory framework relates to the traditional quasi-federalist structure of government administration in China, the significant degree of decentralization in policymaking and enforcement. To protect local interests and promote local development, governments at sub-national levels may ignore, bypass or not fully enforce rules issued by the central government.Footnote 55

In the electricity sector, the delegation of decision making to the provincial level in the mid-1980s has unwittingly increased local control over the electricity system. Divergence in interests between the central and local governments has led to the emergence of parallel policy agendas, with the most striking jurisdictional conflict lying in rate making and investment planning.Footnote 56 Final local tariffs for both power generation and consumption are decided by local price offices, which are subject to the scrutiny of the NDRC's price bureau. To promote local development and driven by self-reliance, provincial governments have used their discretionary powers to approve a large number of small-scale power projects. Applications for larger projects are submitted to the NDRC through its provincial branches. Although powerful, the NDRC at the central level is understaffed.Footnote 57 Limited capacity, together with information asymmetry, makes it difficult for the state commission to investigate all proposed projects thoroughly and review prices submitted by its local units.Footnote 58

In fact, central agencies often have just a modicum of authority over their local offices, even though the latter are formally part of the former's vertical chain of command.Footnote 59 Provincial branches of the SERC rely on local labour markets for staffing and local governments for information. Provincial offices of the NDRC and MEP are financed by, and required to report to, provincial governments.Footnote 60 Collusion is pervasive among local governments, local state-owned electricity companies and local branches of central agencies, making it easy to advance local interests but potentially difficult to enforce national policies.Footnote 61 Appraised according to their economic growth, local governments tend to deprioritize compliance with environmental targets and related policy initiatives set by the central government.

Structural barriers

The grid companies and the Big Five have political connections through the membership of their key executives in the Central Committee of the Chinese Communist Party and because of the sector's importance as a political base for government leaders.Footnote 62 They also have ties with the NDRC and SERC through the “old-boy networks” of ex-industry ministry staff. Therefore, the companies have become too powerful to be fully subject to the authority of the agencies. Their dominance is particularly obvious when up against the SERC, given the latter's precarious institutional standing and the fact that the top managers of the companies hold administrative ranks on a par with the SERC's chairman.Footnote 63

To promote competition in electricity generation, the SERC issued a 20 per cent cap on the market share of any single firm in any single region. However, evidence shows that the Big Five did not strictly abide by this. For instance, China Power Investment Corporation (one of the Big Five) has a market share of more than 20 per cent in both the north-eastern and north-western markets.Footnote 64 The reason, to a great extent, relates to fragmented authority and conflicting agendas among the governing agencies. The SASAC has actively promoted the expansion of the Big Five in all segments of the electricity generation sub-sector. Facing rising coal prices, the companies integrated upwards to run their own coalmines, encouraged and endorsed by the SASAC and NDRC.Footnote 65 They have gained the franchise for developing all of China's major rivers, leaving no room for private participation in large-scale hydropower stations.Footnote 66 Three of them are leading players in other renewables.Footnote 67 Despite its mandated responsibility for ensuring competition in electricity generation, the SERC is unable to stop the expansion of these companies.Footnote 68 Consequently, the Big Five's dominance has even increased slightly, with their share in installed capacity rising from around 40 per cent at the time of unbundling in 2002 to 49 per cent in 2010.Footnote 69

The upward integration and continued dominance of the Big Five serve as effective barriers to the sector for IPPs, despite the fact that the legal barriers to entry were removed as long ago as the mid-1980s.Footnote 70 Constrained by access to finance, IPPs tend to develop small-scale power projects, the approval of which rests with provincial governments. However, at the local level, state-owned projects often enjoy preferential treatment in investment approval, whereas private investors may be disadvantaged if they lack local connections.Footnote 71 Consequently, there has been a general withdrawal of private investment along with a proliferation of small-scale, local-based power plants.Footnote 72

The grid companies are regional monopolies. In the presence of a natural monopoly, access regulation is important to ensure power producers have equal access to the transmission wires – exactly what the SERC is mandated to do. However, given the SERC's weak authority, the grid companies have significant discretion over grid access.Footnote 73 They favour their affiliated generating plants and other state-owned power stations over privately invested power producers.Footnote 74 In addition, the grid companies favour coal-fired electricity over renewables because they are unable to pass on to consumers the losses they face when purchasing renewable energy (this issue is discussed in detail below). Their dominance over the sector also means that it is potentially difficult for the SERC to mandate these companies to invest in DSM programmes (discussed below).

Economic barriers

Overcoming economic barriers on the supply side involves creating conditions that level the playing field for plants of varying degrees of “greenness,” with pricing, investment planning and dispatch arrangements all playing an important role. Moreover, pricing is important for demand-side solutions because it provides incentives for end-users to save energy and for grid companies to invest in DSM programmes. In China, there are two sets of electricity prices: on-grid tariffs – the wholesale prices paid by grid companies to power stations; and catalogue prices – the prices paid by end users to grid companies. The NDRC and local price offices set both prices.

As the economic planning body, the NDRC sets on-grid tariffs that should allow for capacity expansion to keep up with China's fast economic growth.Footnote 75 A model of “cost repayment plus return” has been adopted to serve this purpose. Both prices and volume quotas are set in power purchase contracts to allow for the recovery of investment costs and the earning of reasonable profits. Under a quota-based dispatch system, annual operating hours are allocated to power stations according to their capacity size.Footnote 76 The NDRC issues a guidance price for each region and then allows local price offices to make adjustments and decide the final prices for individual power producers.Footnote 77 Owing to the collusion between local governments and local price offices, local tariffs tend to be higher than regional guidance prices, and the tariffs received by well-connected power producers – mostly local state-owned companies – are usually more favourable than those for private IPPs.Footnote 78

The same pricing model and process are used for renewables, except for large national projects granted through a bidding-based concession scheme (discussed below). Recently, feed-in tariffs (FITs) have been introduced to make the installation of renewable capacity more attractive by adding a premium to the average wholesale prices of coal-fired electricity.Footnote 79 Nonetheless, the price difference between coal-based power and renewables does not compensate for the positive externalities of the latter.Footnote 80

Efforts have been made to introduce emission charges. However, these efforts have encountered difficulties owing to the conflicts arising between governing agencies. Five agencies are involved, namely the SERC, NDRC, MEP, the Ministry of Finance, and the State Tax Administration. The conflicts revolve around the charge bands, how to track emissions, who should bear the cost of installing the tracking system, who should collect the levies, and how the revenues raised should be used.Footnote 81 Furthermore, the implementation of emission charges has met with local resistance because of the divergence in priorities between central and provincial governments.Footnote 82 These problems impede the creation of a level playing field for different generating technologies and, under the current dispatch system, discourage power generation and dispatch from cleaner plants as they fail to improve the cost-competitiveness of “greener” generating units against dirtier ones.

The way in which on-grid tariffs are set provides little incentive for power producers to improve generation efficiency because there is no provision for tariff reduction over time. The involvement of local governments in setting local tariffs shields local power producers from pressure to adopt efficiency-enhancing practices. Various entry barriers for IPPs and the dominance of the Big Five at the national level and local state-owned power producers at the provincial level mean that there is little pressure from competition to improve generation efficiency.

The NDRC issues guidance on end-user prices and the final rates are decided by local price offices. Overall, prices are set to achieve political and social objectives and according to the types of user, namely industrial, commercial, residential and agricultural. In accordance with the desire to promote economic growth, electricity prices for industries have been kept low, and thus there is little incentive for industrial firms to improve energy efficiency and adopt EE technologies. In order to maintain social stability and contain inflation, residential electricity prices are set far below costs and according to affordability. Such a price scheme may be conducive to meeting the universal-service obligation, but it does not encourage rational electricity consumption or the adoption of energy-saving appliances.

There is no separate price for the use of the grid network, and the revenues of grid companies depend on the discrepancy between on-grid and end-user prices. Owing to difficulties in approving increases in end-user prices, the price premium for renewables squeezes grid companies’ revenues, making them resistant to any increase in FITs that would increase the market competitiveness of renewables. These companies have been unwilling to connect and buy electricity from renewable power plants, even though they are obliged to do so under the power purchase agreements.Footnote 83 There is also little incentive for them to invest in DSM programmes because the costs cannot be recovered through their revenues.

Further discussion

It's clear from the discussion above that electricity pricing and dispatch arrangements have been driven primarily by the need for a rapid expansion of capacity, and little consideration has been given for environmental issues. Investment planning has been guided by the overriding principle of ensuring adequate electricity at the central level, and leans towards the promotion of local interests at the provincial level. There is no incentive for grid companies to purchase renewable energy. The way in which end-user rates are set provides little encouragement to save electricity and improve EE. These policy outcomes can be better understood by applying the analytical framework, which emphasizes the institutional determinants of regulation/policy and the factors which determine the position of environmental considerations in relation to other objectives in policymaking and enforcement.

China's electricity sector serves various objectives. There are the sectoral economic objectives to maintain and expand the provision of services, and sectoral social objectives which relate to universal service. Environmental protection is becoming an increasingly important objective. The sector also carries diverse development goals, the most important of which is to increase the power supply to fuel current and future economic growth.Footnote 84 The government has intervened in the sector for political objectives – preserving political legitimacy and the rule of the party-state – by pursuing the development goals and maintaining social stability.Footnote 85 However, there is another political dimension which relates to the party-state maintaining control over the economy through keeping a firm hold on this strategically important industry.Footnote 86 With regard to the development and political objectives, it is also necessary to bring into the analysis the complex relations between central and local governments. While the central government puts emphasis on the role of the sector in overall economic planning and macroeconomic management, local governments are more interested in developing local industries, maintaining employment and promoting other local interests.

There is considerable and complex functional overlap among the various objectives. The central government's ultimate objective is to maintain political legitimacy. This overlaps in a highly synergistic way with sectoral economic objectives and development goals, in that the economic policy of the sector serves the development goals and economic development deemed necessary for political legitimacy. Stressing accessibility and affordability, the universal service obligation is functionally in line with the government's social-related development goals, which in turn serve the political objective of maintaining social stability. As state ownership has traditionally been used as a means of maintaining economic control, preservation of the party-state's control over the sector (and in turn the economy) hinges upon the expansion of state-owned or state-controlled power companies whose managers are keen to advance their political careers through enlarging the size of the assets under their control. The dominance of state ownership is also conducive to achieving other development/political objectives, in that it is easier for the government to promote the development of particular industries through the setting of preferential electricity prices, and to maintain social stability by keeping residential electricity prices low, if power companies are state-owned. The objectives of central and local governments are partly synergistic and partly conflictive. On the one hand, the pursuit of the central government's development goals depends, to a great extent, on the development of individual provinces. Appraising local governments according to economic growth may have strengthened the functional synergy between the development goals pursued by governments at different levels. On the other hand, local-oriented policies adopted by individual provinces may have negative externalities (including pollution) on other provinces and on the economy as a whole, which is where national and local goals are functionally conflictive. The central government tends to be more tolerant towards local policies that conflict with the centre's goals when the need for increased electricity supply and/or the promotion of economic growth becomes more pressing.

The goal of tackling pollution stands in considerable conflict with the sector's economic policy, given the abundance of coal in China and the irreplaceable role of coal-fired plants in serving peak loads. In turn, there is a lack of functional synergy between environmental objectives and the goal of supplying adequate electricity for economic growth. Despite drawing the increasing attention of the central government, environmental issues are not considered as ultimately vital for political legitimacy and stability, and therefore have received less political commitment than the task of ensuring adequate power supply. Local governments demonstrate even less commitment to environmental issues, which is unsurprising given the overriding economic criterion used to appraise local officials and substantial conflictive overlap between environmental objectives and local priorities.

Environmental considerations have become subordinate to the economic and development goals in policymaking and enforcement. The prioritizing of objectives and the nature of functional overlap between them explain the allocation of policy responsibilities among governing bodies and their position in the power structure. Given the importance of sectoral economic policy/regulation to the development and political goals, the NDRC – the key bureaucratic arm of the government – has maintained control over pricing and investment approval. It has been dominant in the competition among governing agencies and has overriding power over the MEP on issues where economic concerns conflict with environmental considerations. It's no surprise that the SERC was folded into the NEA and made subordinate to the NDRC. No fundamental change can be expected from this move if relations between various objectives and the political commitment to tackling pollution remain unchanged. When it comes to central–local government relations, the delegation of authority appears to prevail because of cyclic power shortages.

Under such a governance structure and process, the regulation and administration of electricity have been politicized. Regulatory policies/instruments have been designed and implemented primarily to expand generation capacity on the supply side, and to facilitate industrial development and maintain social stability on the demand side. Measures designed to preserve state ownership have been favoured for the purpose of control and to ease the advance of government objectives, central and/or local. As a result, the incentives from such policies/instruments are not (or are not intended to be) conducive to overcoming the economic barriers to the deployment of supply- and demand-side solutions.

Pollution-control Measures in China

In view of the above analysis, this section examines supply- and demand-side measures adopted in China. A full evaluation of their effectiveness warrants separate research and is beyond the scope of this paper. The aim of this section is to shed light on the challenges faced in the adoption of supply- and demand-side measures, drawing upon, where necessary, evidence reported in existing literature.

Supply-side measures

Major measures to reduce pollution from coal-based electricity generation include the so-called “big-up/small-down” scheme and a mandate to retrofit generating units with flue gas desulfurization (FGD) equipment. Commitment has been made to develop renewables to reduce coal's dominance in power generation.

The “big-up/small-down” scheme was introduced in 2007. Its primary aims are to phase out small and/or old generating units and to ensure that all newly installed units be at least 600MW. The NDRC introduced an initiative that lowered feed-in tariffs for small units as an economic incentive to support the scheme. It was reported that 553 units totalling 14.4 GW capacity were shut down in 2007.Footnote 87 Interestingly but unsurprisingly, most of the closed units were owned by the Big Five and almost all of the orders for new supercritical units were also placed by them.Footnote 88 With access to finance usually unavailable to non-national firms, the Big Five were able to afford the upfront investment needed to install new, large-scale units with advanced power cycles. In fact, they had a strong incentive to replace small units with larger ones under the cost-plus pricing regime and the current dispatch arrangement in which operating hours are allocated according to the size of installed capacity. However, there are reports that, once increased operating hours and relatively higher prices are secured in their power purchase agreements, many power stations have chosen to run the new units less often than the remaining older ones which incur low or no capital costs.Footnote 89 They face no penalty for such a practice because of the problems with enforcing emission charges.

Enforcement of the scheme has been less encouraging at the local level, where the majority of small coal-fired units are concentrated.Footnote 90 The aforementioned incentives are less relevant to locally based generators because their main concern is upfront investment. Even the incentivizing effects of lowering tariffs for small units is much diluted because of the role local governments play in setting final on-grid prices. As many local state-owned power plants are constructed with local government finance either through the banking system and/or through fiscal allocations, closing them would generate a significant strain on provincial banks and leave thousands of people unemployed.Footnote 91

In order to reduce SO2 emissions, in 2003 the MEP decreed that all new, expanded or retrofitted coal-fired units should install FGD equipment, and introduced pollution charges on SO2 emissions.Footnote 92 The conflict of interests and lack of cooperation among the NDRC, SERC and MEP meant that the MEP directive and levies were not well enforced.Footnote 93 In 2005, the NDRC introduced a feed-in tariff adder for generators with FGD-equipped units. Partly owing to this initiative and partly to the falling costs of domestic-manufactured FGD components, progress has been recorded and, by the end of 2010, FGD-equipped units accounted for more than three-quarters of all thermal-based capacity.Footnote 94 It should be noted that the tariff adder is granted to stations with FGD-equipped units rather than electricity generated from such units. It has been widely reported that many plants do not use the equipment for power generation because of high operating costs.Footnote 95 The tariff adder may have encouraged installation but, given the problems with enforcing SO2 emissions charges, power producers have no incentive to switch on the scrubbers.

Quantity- and price-based schemes have been introduced to promote the development of renewable energy. A renewable electricity standard (RES) has been implemented whereby all generators with 5GW or more capacity must generate at least 8 per cent of their capacity from non-hydro renewables by 2020.Footnote 96 Power purchasing agreements are used to oblige grid companies to grant grid connection and access to renewable plants and purchase all electricity generated.

A bidding-based concession scheme is used for large renewable projects.Footnote 97 In order to meet the requirement of the RES and access the financial support for capacity installation usually attached to such projects, national state-owned generating companies bid aggressively and undercut their rivals with low bid prices, resulting in tariffs (the winning prices) too low to make the projects economically viable.Footnote 98 All other projects are approved through the normal process, with tariffs set according to the FIT Scheme.

The RES, tendering system and FIT scheme are all biased towards encouraging capacity installation. This is in line with the electricity policy's overriding principle of expanding generation capacity. The incentives for generating electricity from installed capacity are weak, given the problems with enforcing emission charges and the insufficient price premiums for internalizing externalities. The refusal of grid companies to respect their connection and purchase agreement obligations stands as another major obstacle for renewable energy developers. The lack of economic incentives, accompanied by the weak authority of the SERC, has led to a poor enforcement of power purchasing agreements. A general observation is that rapid growth in installed capacity has not been matched by a corresponding growth in power generation and dispatch from renewable sources.Footnote 99 It is estimated that around 30 per cent of installed capacity has been dormant and the other 70 per cent operates far below its nameplate capacity.Footnote 100

Demand-side measures

Demand-side solutions have received less attention. Industries are the largest consumers of electricity. In an attempt to control industrial electricity consumption, the central government has recently introduced price discrimination against selected energy-hungry industries. However, the intervention of local governments in setting local end-user rates has made enforcement difficult in provinces where the targeted industries are their economic lifeline.Footnote 101 Some of the provinces have continued to issue preferential tariffs to enterprises in black-listed industries in order to promote local industrial development.Footnote 102

Not much has been done to contain electricity demand by residential and commercial users despite the fact that their electricity consumption has grown rapidly over the last two decades. An increasing challenge relates to the potential high environmental cost of the resulting flattened system load factors and increased peak demand, which has to be met by keeping reserve coal-fired generating units running because China lacks gas-run peak plants.Footnote 103

DSM measures are used sporadically in some provinces, mainly as a load management tool to deal with power shortages. Challenges for their systematic use as a solution to contain energy consumption come from the low prices for major end-user groups and the lack of incentive for grid companies to invest in DSM programmes under the current price regulation.

Conclusions

Applying an analytical framework which takes into account the literature on supply- and demand-side solutions, regulatory governance and EPI, this paper relates the regulatory framework to the environmental dimension of sustainable development in China's electricity industry. It finds that, in this economically and politically important sector, environmental considerations have become subordinate to the economic and development goals that are deemed crucial for political legitimacy. Regulatory policies/instruments have been intended to incentivize the expansion of generation capacity, facilitate industrial development, and help maintain social stability. However, they are not conducive to levelling the playing field for power plants using different technologies and to encouraging energy saving and energy efficiency by end users, and thereby give rise to challenges for the deployment of supply- and demand-side solutions.

It should be noted that China's development goals are diverse and that emphasis has shifted over time, from an overarching focus on growth targets in the 1990s to, in the current century, the pursuit of a broad development concept in which social and environmental parameters are included.Footnote 104 This gives a glimpse of hope: environmental considerations are moving up the central government's agenda, and increasing political commitment may follow. In fact, rising public anger towards pollution in recent years has become one of the top spurs for social unrest in China.Footnote 105 Environmental problems have become a growing, although not yet the most serious, threat to political legitimacy. This will increase synergetic overlap between environmental and development/political objectives, and in turn change the position of environmental considerations in relation to other concerns in the policy process. Given the important role of local governments in making local polices and enforcing national ones, it may prove crucial to integrate explicit environmental targets in the performance evaluations of local officials in order to align local priorities with the centre's environmental objectives.

Appendix

Interviews were conducted in late 2010 and early 2011. Two officials from the NDRC, one from the SERC, and one from the EPM were interviewed to collect data on the cooperation and conflicts between those agencies, and between the agencies at the central level and their local branches. Four researchers from the Development Research Center of the State Council and the North China Electric Power University, who had conducted extensive research on China's electricity sector, were interviewed to supplement the data collected from the first group of interviewees, particularly with regard to the central–local government conflicts that the interviewed officials were reluctant to comment on. The analysis only uses the views that are shared by interviewees, and/or are consistent with the data collected from second-hand sources.

Footnotes

*

The research on which this paper is based was funded by the British Academy Small Research Grant SG-54112. The views expressed are the author's and do not necessarily reflect those of the funding organization.

1 Williams and Kahrl Reference Williams and Kahrl2008.

3 For example, Collier Reference Collier1997; Peterson and Rose Reference Peterson and Rose2006; Knudsen Reference Knudsen2010.

4 Williams and Kahrl Reference Williams and Kahrl2008; Kahrl et al. Reference Kahrl, Williams, Jianhua and Junfeng2011; and Lema and Ruby Reference Lema and Ruby2007 are among the few studies that relate electricity reform to environmental issues. Analysis of institutions and sustainable energy development is also included in Garcia Reference Garcia2013 and Andrews-Speed Reference Andrews-Speed2010, Reference Andrews-Speed2012.

5 Such organizations include the World Energy Council, IEA, World Bank, etc.

6 IEA 1999.

7 The technical definition of energy efficiency on the supply side is thermal efficiency. The term “generation efficiency” is used here to cover both thermal and non-thermal plants.

8 IEA 2006, 107.

9 IEA 2006.

10 Green Reference Green2008. Emission charges are also called pollution taxes or levies.

11 World Bank 2008.

12 For a review of the theories and practices of incentive regulation, see Hemphill, Meitzen and Schoech Reference Hemphill, Meitzen and Schoech2003.

13 In practice, it may prove sensitive and difficult to raise end-user prices, in particular for residential users, because of the issues of accessibility and universal service. Such social objectives will be discussed later in the paper.

14 World Bank 2008.

16 IEA 2006.

18 Note that technology has an important role to play in cleaning up the sector. However, I do not address the technological barriers separately here; rather, they are integrated into, where necessary, the discussion of economic, structural and institutional barriers. The categorization of the barriers is conceptual. In the real world, the differences between them are not always clear-cut and policies to overcome them are often intertwined.

19 Global World Energy Council 2005.

20 World Bank 2008.

21 For example, IEA 2008; Garcia Reference Garcia2013.

22 IEA 2007, 2008.

23 Levy and Spiller Reference Levy and Spiller1994.

24 Footnote Ibid., 205

27 Maegli and Jaag Reference Maegli and Jaag2009.

29 Lieberthal and Oksenberg Reference Lieberthal and Oksenberg1988.

34 Jordan and Lenschow Reference Jordan and Lenschow2008.

35 Lafferty and Hovden Reference Lafferty and Hovden2003.

36 Schout and Jordan Reference Schout and Jordan2005.

40 State Electricity Regulatory Council 2011.

41 For consistency, the energy bureau is referred to throughout the paper when discussing project approval.

42 The MEP was formed in 2008 from the former State Environmental Protection Administration.

44 See Chen Reference Chen2010 for a discussion of the ties between the sector and top government leaders.

46 Interview with central-level officials, Beijing, November 2010

48 Andrews-Speed Reference Andrews-Speed2010.

50 Cheng and Tsai Reference Cheng, Tsai, Ngo and Wu2009. One of the NDRC officials interviewed in Beijing in January 2011 had previously served in one of the Big Five.

51 Chang and Wang Reference Chang and Wang2010.

54 Interview, central-level officials.

56 Williams and Kahrl Reference Williams and Kahrl2008.

57 Cheng and Tsai Reference Cheng, Tsai, Ngo and Wu2009; interview with NDRC officials, Beijing, January 2011.

59 Lieberthal and Oksenberg Reference Lieberthal and Oksenberg1988.

61 Andrews-Speed Reference Andrews-Speed2010.

63 Lin and Purra Reference Lin and Purra2010.

65 Zhang, Yanhua, and Chen Reference Zhang and Chen2011.

68 Zhang, Yanhua, and Chen Reference Zhang and Chen2011; interview, central-level officials.

69 State Electricity Regulatory Council 2011. The figures referred to were based on the installed capacity owned by the five companies, excluding those controlled by their listed subsidiaries which are substantially independent and therefore counted as IPPs.

71 Sun, Guo and Zheng Reference Chang and Wang2012

72 In China, “IPP” is used as a broad term to cover local government-invested generating companies, listed subsidiaries of the Big Five, and private-invested power producers. The barriers discussed here relate mainly to private IPPs.

73 The State Grid Corporation covers 22 provinces in northern and western China and the South Power Grid manages transmission networks in five southern provinces. Tensions and conflicts exist between the major grid companies and their provincial subsidiaries (see Williams and Kahrl Reference Williams and Kahrl2008 for a detailed discussion). Nonetheless, no distinction is made between them here because they both discriminate against privately-owned power stations and renewables.

74 Zhang, Chi, and Heller Reference Zhang and Heller2004.

76 Pilot projects for “energy efficient dispatch” were implemented in selected provinces in 2007. Nationwide implementation was planned but postponed. See Kahrl, Williams and Hu Reference Kahrl, Williams and Junfeng2013.

79 The premium varies according to energy technologies, geographic locations and availability of renewable resources.

81 Zhang, Zhe, and Xi Reference Zhang and Xi2010; interview, central-level officials.

82 Williams and Kahrl Reference Williams and Kahrl2008.

91 Williams and Kahrl Reference Williams and Kahrl2008.

92 Given the current limited feasibility in switching to low sulfur coal in the country, fitting abatement equipment has been the main approach to reducing SO2 emissions.

93 Chang and Wang Reference Chang and Wang2010.

94 IEA 2012.

95 Li, Ji, and Jiu Fu. 2008. “Thermal plants encouraged to increase desulfurization efforts,” The China Daily, 19 January, 6.

96 National Development and Reform Commission 2007.

97 Projects granted through the scheme account for only a small portion of installed capacity. For instance, installed wind capacity through the scheme constituted 13% of all newly installed capacity in 2008. See Garcia Reference Garcia2013.

101 Yu, Yongzhou Reference Yu2012.

103 Williams and Kahrl Reference Williams and Kahrl2008.

105 Shen, Feifei. 2013. “China air pollution triple WHO recommended levels in first half,” Bloomberg News, 31 July.

References

Andrews-Speed, Philip. 2010. “The institutions of energy governance in China.” Institut Français des Relations Internationales, http://www.ifri.org/en/publications/enotes/notes-de-lifri/institutions-energy-governance-china. Accessed 24 April 2015.Google Scholar
Andrews-Speed, Philip. 2012. The Governance of Energy in China: Transition to a Low-Carbon Economy. New York: Palgrave Macmillan.CrossRefGoogle Scholar
Bonbright, James. 1961. Principles of Public Utility Rates. New York: Columbia University Press.CrossRefGoogle Scholar
Chang, Yen-Chiang, and Wang, Nannan. 2010. “Environmental regulations and emissions trading in China.” Energy Policy 38, 3356–64.CrossRefGoogle Scholar
Chen, Ling. 2010. “Playing the market reform card: the changing patterns of political struggle in China's electric power sector.” The China Journal 64, 6995.CrossRefGoogle Scholar
Cheng, Tun-Jen, and Tsai, Chung-min. 2009. “Powering rent seeking in the electricity industry.” In Ngo, Tak-Wing and Wu, Yongping (eds.), Rent Seeking in China. London: Routledge, 117144.Google Scholar
Collier, Ute. 1997. Energy and Environment in the European Union: The Challenge of Integration. Aldershot: Avebury Studies in Green Research.Google Scholar
Gao, Ciwei, and Yang, Li. 2010. “Evolution of China's power dispatch principle and the new energy saving power dispatch policy.” Energy Policy 38, 7346–57.Google Scholar
Garcia, Clara. 2011. “Grid-connected renewable energy in China: policies and institutions under gradualism, developmentalism, and socialism.” Energy Policy 39, 8046–50.CrossRefGoogle Scholar
Garcia, Clara. 2013. “Policies and institutions for grid-connected renewable energy: ‘best practice’ and the case of China.” Governance 26(1), 119146.CrossRefGoogle Scholar
Global World Energy Council. 2005. “Wind force 12: a blueprint to achieve 12% of the world's electricity from wind power by 2020,” http://www.greenpeace.de/sites/www.greenpeace.de/files/greenpeace_studie_windforce_12_1.pdf. Accessed 25 March 2015.Google Scholar
Green, Richard. 2008. “Carbon tax and carbon permits: the impact on generators’ risks.” The Energy Journal 29(3), 6790.CrossRefGoogle Scholar
Hemphill, Ross, Meitzen, Mark and Schoech, Philip. 2003. “Incentive regulation in network industries: experience and prospects in the US telecommunications, electricity, and natural gas industries.” Review of Network Economics 2, 316337.CrossRefGoogle Scholar
Hood, Christopher, James, Oliver, Jones, George, Scott, Colin and Travers, Tony. 1999. Regulation inside Government: Waste-Watchers, Quality Police, and Sleaze-Busters. Oxford: Oxford University Press.CrossRefGoogle Scholar
Hsueh, Roselyn. 2011. China's Regulatory State: A New Strategy for Globalization. Ithaca: Cornell University Press.CrossRefGoogle Scholar
IEA (International Energy Agency). 1999. “Retrofit of power stations for green house gas abatement: case studies.” IEA Greenhouse Gas Programme, Report No. Ph3/18.Google Scholar
IEA. 2006. China's Power Sector Reforms: Where to Next? Paris: IEA.Google Scholar
IEA. 2007. World Energy Outlook. Paris: IEA.Google Scholar
IEA. 2008. Deploying Renewables: Principles for Effective Policies. Paris: IEA.Google Scholar
IEA. 2012. “Non-greenhouse gas emission from coal-fired power plants in China,” IEA Clean Coal Centre Profiles 12(4), http://www.iea-coal.org.uk/documents/82991/8493/Non-greenhouse-gas-emissions-from-coal-fired-power-plants-in-China,-CCC/196.Google Scholar
Jordan, Andrew, and Lenschow, Andrea (eds.). 2008. Innovation in Environmental Policy? Integrating the Environment for Sustainability. Cheltenham: Edward Elgar.CrossRefGoogle Scholar
Kahrl, Fredrich, Williams, Jim, Jianhua, Ding and Junfeng, Hu. 2011. “Challenges to China's transition to a low carbon electricity system.” Energy Policy 39, 4032–41.CrossRefGoogle Scholar
Kahrl, Fredrich, Williams, Jim and Junfeng, Hu. 2013. “The political economy of electricity dispatch reform in China.” Energy Policy 53, 361–69.CrossRefGoogle Scholar
Knudsen, Jørgen. 2010. “Integration of environmental concerns in a trans-Atlantic perspective: the case of renewable electricity.” Review of Policy Research 27(2), 127146.CrossRefGoogle Scholar
Lafferty, William, and Hovden, Eivind. 2003. “Environmental policy integration: towards an analytical framework.” Environmental Politics 12(3), 122.CrossRefGoogle Scholar
Lema, Adrian, and Ruby, Kristian. 2007. “Between fragmented authoritarianism and policy coordination: creating a Chinese market for wind energy.” Energy Policy 35(7), 3879–90.CrossRefGoogle Scholar
Levy, Brian, and Spiller, Pablo. 1994. “The institutional foundation of regulatory commitment: a comparative analysis of telecommunications regulation.” Journal of Law, Economics and Organization 10(2), 201246.Google Scholar
Liao, Cuiping, Jochem, Eberhard, Zhang, Yi and Farid, Nida. 2010. “Wind power development and policies in China.” Renewable Energy 35, 1879–86.CrossRefGoogle Scholar
Lieberthal, Kenneth, and Oksenberg, Michel. 1988. Policy Making in China: Leaders, Structures, and Processes. Princeton: Princeton University Press.CrossRefGoogle Scholar
Lin, Kun-Chin, and Purra, Mika. 2010. “Transforming China's industrial sectors: institutional change and regulation of the power sector in the reform era.” Working Paper No. SPP10-12, Lee Kuan Yew School of Public Policy, National University of Singapore.Google Scholar
Littlechild, Stephen. 1983. Regulation of British Telecommunications’ Profitability: Report to the Secretary of State. London: Department of Industry.Google Scholar
Ma, Jinlong. 2011. “On-grid electricity tariffs in China: development, reform, and prospects.” Energy Journal 39, 2633–45.Google Scholar
Maegli, Martin, and Jaag, Christian. 2009. “Regulatory governance costs in network industries: implications for postal regulation.” MPRA Working Paper No. 15309, http://mpra.ub.uni-muenchen.de/15309/1/MPRA_paper_15309.pdf.Google Scholar
National Development and Reform Commission. 2007. Medium- and Long-Term Plan for Renewable Energy Development. Beijing: NDRC.Google Scholar
Peterson, Thomas, and Rose, Adam. 2006. “Reducing conflicts between climate policy and energy policy in the US: the important role of the States.” Energy Policy 34(5), 619631.CrossRefGoogle Scholar
Qiu, Xin, and Li, Honglin. 2012. “Energy regulation and legislation in China.” Environmental Law Reporter 42, 10678–693.Google Scholar
Rosen, Daniel, and Houser, Trevor. 2007. “China energy: a guide for the perplexed.” Washington, DC: Peterson Institute for International Economics.Google Scholar
Schout, Adriaan, and Jordan, Andrew. 2005. “Coordinated European governance: self organizing or centrally steered.” Public Administration 83(1), 201220.CrossRefGoogle Scholar
Spiller, Pablo, and Tommasi, Mariano. 2005. “The institutions of regulation: an application to public utilities.” In Menard, Claude and Shirley, Mary (eds.), Handbook of New Institutional Economics. Berlin: Springer, 515543.CrossRefGoogle Scholar
State Electricity Regulatory Council. 2011. Electricity Regulatory Annual Report 2010. Beijing: State Electricity Regulatory Commission.Google Scholar
Sun, Xuegong, Guo, Liyan and Zheng, Zeng. 2012. “Market entry barriers for FDI and private investors: lessons from China's electricity market.” ERIA Discussion Paper Series, ERIS-DP-2012-17. In Wu, Yanru, Shi, Xunpeng and , Fukunari, Kimura (eds.), Energy Market Integration in East Asia: Theories, Electricity Sector and Subsidies. Jakarta: ERIA, 83102.Google Scholar
Williams, James, and Kahrl, Fredrich. 2008. “Electricity reform and sustainable development in China.” Environmental Research Letters 3(4), http://www.iop.org/EJ/article/1748-9326/3/4/044009/erl8_4_044009.html.CrossRefGoogle Scholar
Wirtshafter, Robert. 1990. “Decentralization of China's electricity sector: is small beautiful?World Development 18(4), 505512.CrossRefGoogle Scholar
World Bank. 2008. Financing Energy Efficiency: Lessons from Brazil, China, India, and Beyond . Washington, DC: World Bank.Google Scholar
Xu, Chenggang 2011. “The fundamental institutions of China's reforms and development.” Journal of Economic Literature 49(4), 10761151.CrossRefGoogle Scholar
Yu, Yongzhen. 2012. “How to fit demand side management (DSM) into current Chinese electricity system reform?Energy Economics 34, 549557.CrossRefGoogle Scholar
Zhang, Chi, and Heller, Thomas. 2004. “Reform of the Chinese electric power market: economics and institutions.” Stanford Program on Energy and Sustainable Development Working Paper No. 4, Stanford University.Google Scholar
Zhang, Yanhua, and Chen, Yongjun. 2011. “Vertical relationship in China's electricity industry: the quest for competition?Utilities Policy 19, 142151.CrossRefGoogle Scholar
Zhang, Zhe, and Xi, Si. 2010. “Environmental tax delayed,” Economic Observer On-Line, 29 March, http://www.eeo.com.cn/ens/Politics/2010/03/29/166354.shtml. Accessed 5 April 2012.Google Scholar