Hostname: page-component-cd9895bd7-gvvz8 Total loading time: 0 Render date: 2024-12-25T05:30:40.342Z Has data issue: false hasContentIssue false

Robot ensembles for building construction

Published online by Cambridge University Press:  09 March 2009

Murray A. Muspratt
Affiliation:
Visiting Scholar in Civil Engineering, University of Illinois, 2143 Newmark Lab., 208 N. Romine St., Urbana, IL 61801 (U.S.A).

Summary

Robot intensiveness in the manufacturing industry is growing rapidly, but the construction industry has been slow to capitalise on the array of robotic technology now available. An attempt is made to indentify various robot ensembles that may prove economically viable in building construction, and to configure these in such a way that particular characteristics of robot work methods are used to maximum advantage within the constraints of the construction environment.

Type
Research Article
Copyright
Copyright © Cambridge University Press 1988

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

1.Muspratt, M.A., ‘Eastasia-Rim Projects’ Project Management J. (PMI) XVIII, No. 1, 6367 (03, 1987).Google Scholar
2.Evans, J.M. (ed.), ‘Measurement Technology for Automation in Construction and Large Scale Assembly’ Proceedings of a Workshop sponsored by the National Bureau of Standards, NBSIR 853310 (02 5–6, 1985).CrossRefGoogle Scholar
3.Muspratt, M.A., ‘The Megaproject and Productivity, Cost Engineering (AACE) 26, No. 2, 2536 (04, 1984).Google Scholar
4.Muspratt, M.A., ‘Urban Degradation and Building Systems’, J Urban Planning & Development Div. ASCE 99, No. UP2, 235246 (09, 1973).CrossRefGoogle Scholar
5.Muspratt, M.A., ‘Optimal Transshipment of ProductsIntern, J. Systems Science 4, No. 5, 727738 (1973).Google Scholar
6.Muspratt, M.A., Artificial Intelligence' J Professional Issues in Engineering ASCE 112, No. 3, 158169 (07, 1986).CrossRefGoogle Scholar
7.Muspratt, M.A., ‘Computers for the Construction IndustryProject Mgmt Quart (PMI) 14, No. 3, 4552 (09, 1983).Google Scholar
8.Warszawski, A., ‘Robots in the Construction Industry’, Robotica 4, 181188 (1986).CrossRefGoogle Scholar