Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by Crossref.
Kusiak, A.
1986.
FMS scheduling: A crucial element in an expert system control structure.
p.
653.
Reyman, G.
1987.
Design of assembly systems.
The International Journal of Advanced Manufacturing Technology,
Vol. 2,
Issue. 3,
p.
13.
Bobeanu, Carmen
Neagu, Gabriel
and
Filip, Florin
1988.
Systems Analysis and Simulation II.
Vol. 2,
Issue. ,
p.
140.
Gunawardane, Gamini
1988.
A note on planning station loading in flexible manufacturing systems.
Robotica,
Vol. 6,
Issue. 4,
p.
297.
Kusiak, Andrew
and
Chen, Mingyuan
1988.
Expert systems for planning and scheduling manufacturing systems.
European Journal of Operational Research,
Vol. 34,
Issue. 2,
p.
113.
Kusiak, Andrew
1988.
Scheduling flexible machining and assembly systems.
Annals of Operations Research,
Vol. 15,
Issue. 1,
p.
337.
Shanker, Kripa
and
Agrawal, Anil Kumar
1991.
Loading problem and resource considerations in FMS: a review.
International Journal of Production Economics,
Vol. 25,
Issue. 1-3,
p.
111.
Gagnon, R.J.
and
Ghosh, S.
1991.
Assembly line research: Historical roots, research life cycles and future directions.
Omega,
Vol. 19,
Issue. 5,
p.
381.
GHOSH, SOUMEN
and
GAGNON, ROGER J.
1991.
Manufacturing and Automation Systems: Techniques and Technologies, Part 2 of 5.
Vol. 46,
Issue. ,
p.
355.
Tempelmeier, Horst
and
Kuhn, Heinrich
1992.
OR-Modelle zur Planung flexibler Fertigungssysteme Ein Überblick.
Operations-Research-Spektrum,
Vol. 14,
Issue. 4,
p.
177.
Katalinic, Branko
1992.
Design of Control Structures for Complex Flexible Manufacturing Systems.
IFAC Proceedings Volumes,
Vol. 25,
Issue. 8,
p.
26.
Atan, Tankut S.
and
Pandit, Ram
1996.
Auxiliary tool allocation in flexible manufacturing systems.
European Journal of Operational Research,
Vol. 89,
Issue. 3,
p.
642.
Hsing-Pei Kao
Yun-Sheng Hou
Lee, J.
and
Jong-Yih Kuo
1996.
A fuzzy-logic based trade-off analysis for aggregating flexibility measures of FMSs.
p.
527.