Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by
Crossref.
Waligora, Grzegorz
2015.
Genetic algorithm for a discrete-continuous project scheduling problem with discounted cash flows.
p.
52.
Waligóra, Grzegorz
2016.
Comparative Analysis of Some Metaheuristics for Discrete-Continuous Project Scheduling with Activities of Identical Processing Rates.
Asia-Pacific Journal of Operational Research,
Vol. 33,
Issue. 03,
p.
1650015.
Waligora, Grzegorz
and
Rozycki, Rafal
2016.
Heuristic solving some discrete-continuous project scheduling problems with discounted cash flows.
p.
971.
Waligora, Grzegorz
2017.
Metaheuristics for some discrete-continuous project scheduling problems to maximize the net present value.
p.
471.
Rozycki, Rafal
and
Waligora, Grzegorz
2017.
Energy-aware scheduling of jobs performed sequentially.
p.
453.
Zheng, Weibo
He, Zhengwen
Wang, Nengmin
and
Jia, Tao
2018.
Proactive and reactive resource-constrained max-NPV project scheduling with random activity duration.
Journal of the Operational Research Society,
Vol. 69,
Issue. 1,
p.
115.
Rozycki, Rafal
and
Weglarz, Jan
2018.
Improving the Efficiency of Scheduling Jobs Driven by a Common Limited Energy Source.
p.
932.
Rozycki, Rafal
and
Waligora, Grzegorz
2018.
Power-Aware Scheduling of Preemptable Independent Jobs on a Single Processor to Meet a Schedule Deadline.
p.
943.
Różycki, Rafał
and
Waligóra, Grzegorz
2019.
On a certain class of power- and energy-related scheduling problems.
Discrete Applied Mathematics,
Vol. 264,
Issue. ,
p.
167.
Rozycki, Rafal
and
Waligora, Grzegorz
2019.
Scheduling identical jobs with linear resource usage profile to minimize schedule length.
p.
170.
Gendreau, Michel
and
Potvin, Jean-Yves
2019.
Handbook of Metaheuristics.
Vol. 272,
Issue. ,
p.
37.
Liang, Yangyang
Cui, Nanfang
Wang, Tian
and
Demeulemeester, Erik
2019.
Robust resource-constrained max-NPV project scheduling with stochastic activity duration.
OR Spectrum,
Vol. 41,
Issue. 1,
p.
219.
Rozycki, Rafal
Waligora, Grzegorz
and
Lemanski, Tomasz
2021.
Evolutionary Algorithm for Scheduling Battery Charging Jobs with Decreasing Power Demands to Minimize the Makespan.
p.
275.
Asadujjaman, Md.
Rahman, Humyun Fuad
Chakrabortty, Ripon K.
and
Ryan, Michael J.
2021.
An Immune Genetic Algorithm for Solving NPV-Based Resource Constrained Project Scheduling Problem.
IEEE Access,
Vol. 9,
Issue. ,
p.
26177.
Waligora, Grzegorz
2022.
Genetic Algorithm for Resource Leveling Problems under Various Objective Functions.
p.
414.
Asadujjaman, Md.
Rahman, Humyun Fuad
Chakrabortty, Ripon K.
and
Ryan, Michael J.
2022.
Multi-operator immune genetic algorithm for project scheduling with discounted cash flows.
Expert Systems with Applications,
Vol. 195,
Issue. ,
p.
116589.