Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by
Crossref.
Gupta, Jatinder N.D.
Krüger, Karin
Lauff, Volker
Werner, Frank
and
Sotskov, Yuri N.
2002.
Heuristics for hybrid flow shops with controllable processing times and assignable due dates.
Computers & Operations Research,
Vol. 29,
Issue. 10,
p.
1417.
Ehrgott, Matthias
and
Gandibleux, Xavier
2003.
Multiple Criteria Optimization: State of the Art Annotated Bibliographic Surveys.
Vol. 52,
Issue. ,
p.
369.
T'kindt, Vincent
Gupta, Jatinder N.D.
and
Billaut, Jean-Charles
2003.
Two-machine flowshop scheduling with a secondary criterion.
Computers & Operations Research,
Vol. 30,
Issue. 4,
p.
505.
Angel, Eric
Bampis, Evripidis
and
Kononov, Alexander
2003.
On the approximate tradeoff for bicriteria batching and parallel machine scheduling problems.
Theoretical Computer Science,
Vol. 306,
Issue. 1-3,
p.
319.
Garen, Joost
2004.
Metaheuristics for Multiobjective Optimisation.
Vol. 535,
Issue. ,
p.
201.
Lin, Chien-Hung
and
Liao, Ching-Jong
2004.
Makespan minimization subject to flowtime optimality on identical parallel machines.
Computers & Operations Research,
Vol. 31,
Issue. 10,
p.
1655.
Suresh, R.K.
and
Mohanasundaram, K.M.
2004.
Pareto archived simulated annealing for permutation flow shop scheduling with multiple objectives.
p.
712.
Arroyo, J E C
and
Armentano, V A
2004.
A partial enumeration heuristic for multi-objective flowshop scheduling problems.
Journal of the Operational Research Society,
Vol. 55,
Issue. 9,
p.
1000.
Reza Hejazi *, S.
and
Saghafian, S.
2005.
Flowshop-scheduling problems with makespan criterion: a review.
International Journal of Production Research,
Vol. 43,
Issue. 14,
p.
2895.
Arroyo, José Elias Claudio
and
Armentano, Vinícius Amaral
2005.
Genetic local search for multi-objective flowshop scheduling problems.
European Journal of Operational Research,
Vol. 167,
Issue. 3,
p.
717.
Varadharajan, T.K.
and
Rajendran, Chandrasekharan
2005.
A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs.
European Journal of Operational Research,
Vol. 167,
Issue. 3,
p.
772.
Zhou, Xuesong
and
Zhong, Ming
2005.
Bicriteria train scheduling for high-speed passenger railroad planning applications.
European Journal of Operational Research,
Vol. 167,
Issue. 3,
p.
752.
Suresh, R.K.
and
Mohanasundaram, K.M.
2006.
Pareto archived simulated annealing for job shop scheduling with multiple objectives.
The International Journal of Advanced Manufacturing Technology,
Vol. 29,
Issue. 1-2,
p.
184.
Pasupathy, T.
Rajendran, Chandrasekharan
and
Suresh, R.K.
2006.
A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs.
The International Journal of Advanced Manufacturing Technology,
Vol. 27,
Issue. 7-8,
p.
804.
Haral, Uday
Chen, Rew-Win
Ferrell, William G.
and
Kurz, Mary Beth
2007.
Multiobjective single machine scheduling with nontraditional requirements.
International Journal of Production Economics,
Vol. 106,
Issue. 2,
p.
574.
Lin, Feng-Cheng
Lai, Chien-Yin
and
Hong, Jen-Shin
2008.
Minimize presentation lag by sequencing media objects for auto-assembled presentations from digital libraries.
Data & Knowledge Engineering,
Vol. 66,
Issue. 3,
p.
382.
Minella, Gerardo
Ruiz, Rubén
and
Ciavotta, Michele
2008.
A Review and Evaluation of Multiobjective Algorithms for the Flowshop Scheduling Problem.
INFORMS Journal on Computing,
Vol. 20,
Issue. 3,
p.
451.
Lei, Deming
2009.
Multi-objective production scheduling: a survey.
The International Journal of Advanced Manufacturing Technology,
Vol. 43,
Issue. 9-10,
p.
926.
Mokotoff, E.
2009.
Computational Intelligence in Flow Shop and Job Shop Scheduling.
Vol. 230,
Issue. ,
p.
101.
Braglia, Marcello
and
Grassi, Andrea
2009.
A new heuristic for the flowshop scheduling problem to minimize makespan and maximum tardiness.
International Journal of Production Research,
Vol. 47,
Issue. 1,
p.
273.