Hostname: page-component-586b7cd67f-l7hp2 Total loading time: 0 Render date: 2024-11-28T04:22:36.326Z Has data issue: false hasContentIssue false

Groundwater diversion from a deep-rock repository for spent nuclear fuel: Ecohydrological assessment of environmental impacts

Published online by Cambridge University Press:  09 January 2012

K. Werner
Affiliation:
EmpTec, Larmvägen 8, SE-187 75 Täby, Sweden
P. Collinder
Affiliation:
Ekologigruppen AB, Åsögatan 121, SE-116 24 Stockholm, Sweden
S. Berglund
Affiliation:
Swedish Nuclear Fuel and Waste Management Co, Box 250, SE-101 24 Stockholm, Sweden
E. Bosson
Affiliation:
Swedish Nuclear Fuel and Waste Management Co, Box 250, SE-101 24 Stockholm, Sweden
Get access

Abstract

Forsmark in Mideastern Sweden is chosen as site for the planned Swedish deep-rock repository for spent nuclear fuel. The construction, operation and decommissioning of the repository require assessments of various types of risks for health and environment on a wide range of temporal scales. This study is focused on the assessment of environmental impacts during the relatively short construction and operation phases, during which the repository will be kept drained by means of groundwater diversion. This diversion may influence hydrogeological and hydrological conditions and thereby cause ecological and other types of consequences in the surroundings of the repository. We here describe methodology and some main findings from the ecohydrological assessment of consequences for aquatic and terrestrial ecosystems in Forsmark. The assessment combines the results of a number of steps, including ecological field inventories and predictive water-flow modelling. The results of the study show that subsurface disposal of radioactive waste is an important application of ecohydrological concepts in assessments of sites with nature values.

Type
Research Article
Copyright
© Owned by the authors, published by EDP Sciences, 2011

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

SKBF/KBS, Final storage of spent nuclear fuel – KBS-3, Part I-IV (Svensk Kärnbränsleförsörjning AB, Stockholm, 1983).
SKB, Long-term safety for the final repository for spent nuclear fuel at Forsmark – Main report of the SR-Site project, vol. I–III, SKB TR-11-01 (Svensk Kärnbränslehantering AB, Stockholm, 2011).
SKB, Site description of Forsmark at completion of the site investigation phase, SKB TR-08-05 (Svensk Kärnbränslehantering AB, Stockholm, 2008).
Lindborg T. (Ed.), Surface system Forsmark – Site descriptive modelling, SDM-Site Forsmark, SKB R-08-11 (Svensk Kärnbränslehantering AB, Stockholm, 2008).
Hedenström A., Sohlenius G., Description of regolith at Forsmark – Site descriptive modelling, SDM-Site Forsmark, SKB R-08-04 (Svensk Kärnbränslehantering AB, Stockholm, 2008).
Johansson, P.-O., Description of surface hydrology and near-surface hydrogeology at Forsmark – Site descriptive modelling, SDM-Site Forsmark, SKB R-08-08 (Svensk Kärnbränslehantering AB, Stockholm, 2008).
Follin S., Bedrock hydrogeology Forsmark – Site descriptive modelling, SDM-Site Forsmark, SKB R-08-95 (Svensk Kärnbränslehantering AB, Stockholm, 2008).
SKB, Underground design Forsmark – Layout D2, SKB R-08-116 (Svensk Kärnbränslehantering AB, Stockholm, 2009).
Hamrén U., Collinder P., Vattenverksamhet i Forsmark – Ekologisk fältinventering och naturvärdesklassificering samt beskrivning av skogsproduktionsmark, SKB R-10-16 (Svensk Kärnbränslehantering AB, Stockholm, 2010). (In Swedish, with Summary in English.)
Sohlenius G., Hedenström A., Platsundersökning Forsmark – Stratigrafiska undersökningar i våtmarksobjekt, SKB P-09-18 (Svensk Kärnbränslehantering AB, Stockholm, 2009). (In Swedish, with Abstract in English.)
Werner K., Lundholm L., Johansson P.-O., Platsundersökning Forsmark – Installation av grundvattenrör och pegelrör i våtmarker och sjön Tjärnpussen, SKB P-09-17 (Svensk Kärnbränslehantering AB, Stockholm, 2009). (In Swedish, with Abstract in English.)
Mårtensson E., Gustafsson L.-G., Gustafsson A.-M., Aneljungh M., Sabel U., Hydrologiska och hydrogeologiska effekter på våtmarker och skogsområden av slutförvarsanläggningen i Forsmark, SKB R-10-19 (Svensk Kärnbränslehantering AB, Stockholm, 2010). (In Swedish, with Summary in English.)
Florgård C., Linnér H., Olsson M., Olsson S., Persson G., Wiklander G., Grundvattensänkning på Hallandsås – Effekter på natur, jordbruk och skogsbruk, Samhälls- och landskapsplanering 11 (Swedish University of Agricultural Sciences, Uppsala, 2000). (In Swedish.)
DHI Software, MIKE SHE – User manual (DHI Water & Environment, Hørsholm, 2009).
Mårtensson E., Gustafsson L.-G., Hydrological and hydrogeological effects of an open repository in Forsmark – Final MIKE SHE flow modelling results for the Environmental Impact Assessment, SKB R-10-18 (Svensk Kärnbränslehantering AB, Stockholm, 2010).
Bosson E., Gustafsson L-G, Sassner M, Numerical modelling of surface hydrology and near-surface hydrogeology at Forsmark – Site descriptive modellling, SDM-Site Forsmark, SKB R-08-09 (Svensk Kärnbränslehantering AB, Stockholm, 2008).
Silvert W., Ecol. Modell. 96(1997), 1–10.
Hamrén U., Collinder P., Allmér J., Vattenverksamhet i Forsmark – Bortledande av grundvatten från slutförvarsanläggningen i Forsmark – Beskrivning av konsekvenser för naturvärden och skogsproduktion, SKB R-10-17 (Svensk Kärnbränslehantering AB, Stockholm, 2010). (In Swedish, with Summary in English.)
Werner K., Hamrén U., Collinder P., Vattenverksamhet i Forsmark (del I) – Bortledande av grundvatten från slutförvarsanläggningen för använt kärnbränsle, SKB R-10-14 (Svensk Kärnbränslehantering AB, Stockholm, 2010). (In Swedish, with Summary in English.)