Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by
Crossref.
Chen, Frank Y.
and
Feng, Y.
2006.
OPTIMIZATION AND OPTIMALITY OF (s,S) STOCHASTIC
INVENTORY SYSTEMS WITH NON-QUASICONVEX COSTS.
Probability in the Engineering and Informational Sciences,
Vol. 20,
Issue. 2,
p.
287.
Ross, Andrew M.
Rong, Ying
and
Snyder, Lawrence V.
2008.
Supply disruptions with time-dependent parameters.
Computers & Operations Research,
Vol. 35,
Issue. 11,
p.
3504.
Lodree Jr, E J
and
Taskin, S
2008.
An insurance risk management framework for disaster relief and supply chain disruption inventory planning.
Journal of the Operational Research Society,
Vol. 59,
Issue. 5,
p.
674.
Dey, Oshmita
and
Chakraborty, Debjani
2009.
Fuzzy periodic review system with fuzzy random variable demand.
European Journal of Operational Research,
Vol. 198,
Issue. 1,
p.
113.
Zhou, Sean X.
Chao, Xiuli
and
Lee, Chung-Yee
2009.
Optimal transportation policies for production/inventory systems with an unreliable and a reliable carrier.
Journal of Global Optimization,
Vol. 44,
Issue. 2,
p.
251.
He, Yong
He, Ju
and
Reggiani, Aura
2010.
A Production Model for Deteriorating Inventory Items with Production Disruptions.
Discrete Dynamics in Nature and Society,
Vol. 2010,
Issue. 1,
2011.
Models and Applications of Chaos Theory in Modern Sciences.
p.
290.
Shan, Lu
2011.
Proceedings of the 2011 International Conference on Informatics, Cybernetics, and Computer Engineering (ICCE2011) November 19-20, 2011, Melbourne, Australia.
Vol. 110,
Issue. ,
p.
637.
Masih-Tehrani, Behdad
Xu, Susan H.
Kumara, Soundar
and
Li, Haijun
2011.
A single-period analysis of a two-echelon inventory system with dependent supply uncertainty.
Transportation Research Part B: Methodological,
Vol. 45,
Issue. 8,
p.
1128.
Hishamuddin, H.
Sarker, R.A.
and
Essam, D.
2012.
A disruption recovery model for a single stage production-inventory system.
European Journal of Operational Research,
Vol. 222,
Issue. 3,
p.
464.
Chen, Junlin
Zhao, Xiaobo
and
Zhou, Yun
2012.
A periodic-review inventory system with a capacitated backup supplier for mitigating supply disruptions.
European Journal of Operational Research,
Vol. 219,
Issue. 2,
p.
312.
Bendre, Abhijit Bhagwan
and
Nielsen, Lars Relund
2013.
Inventory control in a lost-sales setting with information about supply lead times.
International Journal of Production Economics,
Vol. 142,
Issue. 2,
p.
324.
Hishamuddin, H.
Sarker, R.A.
and
Essam, D.
2013.
A recovery model for a two-echelon serial supply chain with consideration of transportation disruption.
Computers & Industrial Engineering,
Vol. 64,
Issue. 2,
p.
552.
DeCroix, Gregory A.
2013.
Inventory Management for an Assembly System Subject to Supply Disruptions.
Management Science,
Vol. 59,
Issue. 9,
p.
2079.
Gao, Long
2013.
Collaborative Forecasting, Inventory Hedging and Contract Coordination in Dynamic Supply Risk Management.
SSRN Electronic Journal,
Hishamuddin, Hawa
Sarker, Ruhul A.
and
Essam, Daryl
2014.
A recovery mechanism for a two echelon supply chain system under supply disruption.
Economic Modelling,
Vol. 38,
Issue. ,
p.
555.
Paul, Sanjoy Kumar
Sarker, Ruhul
and
Essam, Daryl
2014.
Managing real-time demand fluctuation under a supplier–retailer coordinated system.
International Journal of Production Economics,
Vol. 158,
Issue. ,
p.
231.
Paul, Sanjoy Kumar
Sarker, Ruhul
and
Essam, Daryl
2014.
Real time disruption management for a two-stage batch production–inventory system with reliability considerations.
European Journal of Operational Research,
Vol. 237,
Issue. 1,
p.
113.
Paul, Sanjoy Kumar
Sarker, Ruhul
and
Essam, Daryl
2015.
Managing risk and disruption in production-inventory and supply chain systems: A review.
Journal of Industrial and Management Optimization,
Vol. 12,
Issue. 3,
p.
1009.
Bai, Ge
Kajiwara, Takehisa
and
Liu, Jianbo
2016.
Measuring the Cost of Individual Disruptions in Multistage Manufacturing Systems.
Journal of Management Accounting Research,
Vol. 28,
Issue. 1,
p.
1.