Article contents
Off-shore oil and gas developments in Alaska: impacts and conflicts
Published online by Cambridge University Press: 27 October 2009
Extract
After three years' delay, work started early in 1974 on the construction of the trans-Alaska pipeline from Prudhoe Bay on the Arctic coast of Alaska 1 270 km to Valdez on the Gulf of Alaska (Ronhovde. 1974). Within three years, the line should be delivering 1.2 million barrels per day, a volume that will be increased eventually to a daily flow of 2 million barrels. Gas production on the North Slope of Alaska will probably be exported through Canada to the United States through a 4 184-km pipeline that will cost an estimated $5.7 billion and, if built, will be one of the largest construction projects ever undertaken; the system will also carry Canadian Arctic gas to southern markets. The size of these projects is in themselves impressive, and they have been spawned and are being launched in an atmosphere of controversy and confusion that, in its different way, is equally impressive.
- Type
- Articles
- Information
- Copyright
- Copyright © Cambridge University Press 1974
References
- 2
- Cited by