Hostname: page-component-586b7cd67f-g8jcs Total loading time: 0 Render date: 2024-11-24T01:15:53.466Z Has data issue: false hasContentIssue false

ULCOS - Pilot testing of the Low-CO2 Blast Furnace processat the experimental BF in Luleå

Published online by Cambridge University Press:  28 January 2009

Get access

Abstract

The ULCOS blast furnace process aims at reducing theCO2 emission of the blast furnace by 50% in two steps:
Decrease of carbon consumption by recyclingmost of the top gas after CO2 removal, which requiresoperating the blast furnace with pure oxygen;
Underground storage of CO2.
The first stage is essential to demonstrate the feasibility of thisnew process. It has been tested over a 6 week campaign atthe LKAB experimental BF in Luleå. The facility was adaptedspecifically for the trials (including the erection of a VPSAplant). Different operating conditions were investigated.In conclusion, and taking into account underground storage,the CO2 emission at the blast furnace was reduced by upto 76%. For the steelmaking plant, this should result in anet CO2-savings of 65% at the level of the hot rolled coil.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2009

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)