Hostname: page-component-586b7cd67f-dsjbd Total loading time: 0 Render date: 2024-12-01T00:33:15.508Z Has data issue: false hasContentIssue false

Simulation of raw material yard at CST

Published online by Cambridge University Press:  31 March 2006

Get access

Abstract

Raw material yard management and the feeding of the blast furnacesare essential processes for an integrated steelwork, and for CSTin particular as the Company plans to raise their annual output from5 to 7.5 Mt. Accordingly, CST has developed a model of raw materialsupply that takes into account every step of the cycle. The modelincludes two complementary modules, one for supply andconsumption of the raw materials and the other one for raw materialstransport. The model has revealed the need for a significantincrease of the conveyor capacity and has made it possible to definemore appropriate priority rules.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2006

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)