Hostname: page-component-78c5997874-mlc7c Total loading time: 0 Render date: 2024-11-08T02:38:36.733Z Has data issue: false hasContentIssue false

Revamping of mould level control equipments at the Dunkirk steelplant

Published online by Cambridge University Press:  11 February 2004

Get access

Abstract

Mould level variations, which are a significant cause of slab downgrading and production troubles at the continuous casters, can result from bad performances and low reliability of control equipments. A revamping project was realized at Dunkirk, after studies and prototype trials which enabled us to select the different components: stopper mechanism and actuating cylinder, level sensor, control electronics. A specific start-up organization, allowing for daily analysis of signals and results and frequent contacts with the engineering team, has permitted to reach quickly the targeted performances.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2004

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)