Hostname: page-component-78c5997874-t5tsf Total loading time: 0 Render date: 2024-11-03T08:57:52.998Z Has data issue: false hasContentIssue false

Project to increase sinter machine productivity aiming at attending the ArcelorMittal Tubarão expansion plan for 7.5 million tons/year

Published online by Cambridge University Press:  20 September 2008

Get access

Abstract

In order to increase their production of steel plates to 7.5 million tons/year, ArcelorMittal Tubarão faced the challenge to increase sinter plant productivity from 34.00 t/d/m2 to 42.00 t/d/m2. This was achieved in June 2006 through three main actuators: raw materials, stabilization and optimization of the current equipment and implementation of new technologies.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2008

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)