Project to increase sinter machine productivity aiming at attending the ArcelorMittal Tubarão expansion plan for 7.5 million tons/year
Published online by Cambridge University Press: 20 September 2008
Abstract
In order to increase their production of steel plates to 7.5 million tons/year, ArcelorMittal Tubarão faced the challenge to increase sinter plant productivity from 34.00 t/d/m2 to 42.00 t/d/m2. This was achieved in June 2006 through three main actuators: raw materials, stabilization and optimization of the current equipment and implementation of new technologies.
- Type
- Research Article
- Information
- Metallurgical Research & Technology , Volume 105 , Issue 9: SinteringElectric Arc FurnaceSteelmakingContinuous CastingEnvironmentHot Rolling , September 2008 , pp. 408 - 413
- Copyright
- © La Revue de Métallurgie, 2008