Hostname: page-component-586b7cd67f-gb8f7 Total loading time: 0 Render date: 2024-11-28T04:17:48.429Z Has data issue: false hasContentIssue false

New continuous annealing line for Rasselstein

Published online by Cambridge University Press:  17 January 2008

Get access

Abstract

In December 2003, Rasselstein GmbH Germany placed an orderwith the consortium VAI (Consortium leader) and Drever (Furnace)for the erection of the new continuous annealing line n° 5. The constructionof this annealing line takes place in a new building simultaneouslywith the construction of the tinning line n° 12. This modernline is unique in that for the first time it is planned to homogeneouslyanneal strips in widths from 800 to 1,400 mm. The future capacityamounts to 360,000 t. After annealing and finishing rolling thematerial is coated in a tinning line after which it finds use as an intermediateproduct for the beverage and packing industries.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2007

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)