Hostname: page-component-586b7cd67f-vdxz6 Total loading time: 0 Render date: 2024-11-27T22:40:48.909Z Has data issue: false hasContentIssue false

New concepts for high-productivity RH plants

Published online by Cambridge University Press:  21 October 2006

Get access

Abstract

The quality and quantity of steel treated in an RH vessel can beenhanced through the optimization of the metallurgical reactionsoccurring during vacuum treatment and with an improvement in theequipment design and plant layout to reduce production-time losses.The enlargement of the diameter of the snorkel and vesselcontribute to an accelerated reaction rate inside the vessel and to anincrease in the overall productivity of an RH plant. With the introductionof twin-station RH plants in connection with a quick vesselexchangedesign, the loss of production time due to ladle transfer,vessel exchange and snorkel maintenance can be significantly reduced.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2006

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)