Hostname: page-component-cd9895bd7-8ctnn Total loading time: 0 Render date: 2024-12-27T06:39:11.913Z Has data issue: false hasContentIssue false

Electric power co-generation by LDG recovery,CDM Project

Published online by Cambridge University Press:  16 November 2007

Get access

Abstract

The Clean Development Mechanism Project elaboration is reviewed,considering every step from the project design document conception,through validation, the approval by the national authorities andthe verification process.The whole development is pioneered by CST ArcelorMittal Brasil,aiming at carbon credits generation and GHG emission reduction.An associated objective is the promotion of sustainable development.The potential of carbon credits generation is estimated to be440,263 tons of CO2 over a CDM project period of 10 years.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2007

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)