Article contents
Actions and control of the hearth of the CST blast furnace No. 2
Published online by Cambridge University Press: 31 March 2005
Abstract
The operation of blast furnace No. 2 started in July 1998, raising the CST yearly hot metal production from 3.6 Mt to the present level of 5.0 Mt. In July 2004, after a 6 years long operation, blast furnace No. 2 cumulated a production of 8.16 Mt, moreover ensuring good performance. The paper presents the actions that have been taken to control hearth wear, while sustaining high productivity and low fuel consumption. The results obtained are submitted to a detailed analysis with appropriate reference to the approach that has been followed and the controls that have been implemented.
- Type
- Research Article
- Information
- Copyright
- © La Revue de Métallurgie, 2005
- 1
- Cited by