Long term high performance operation at Kwangyang blast furnaces

Published online by Cambridge University Press:  06 April 2004

Get access

Abstract

Kwangyang has been operating five large size blast furnaces and K-1 BF was relined in March 2002 after finishing 15 years of operation successfully. To secure enough cast pig iron as one of countermeasures to a low HMR at the steelmaking process during the relining period, four other blast furnaces came to increase their productivity in advance, before the start of the K-1 BF long stoppage. Particularly, during the ultra-high productivity operation period from March to June, K-3 BF marked a new POSCO productivity record and a new silicon record simultaneously on May in spite of unstable sinter consumption due to the width extension of No. 1 & No. 3 sintering strands and 13 years furnace life. It was 2.76 t/day$\cdot$m3/IV in productivity and 0.15% in silicon level in pig iron. These remarkable records were based on some advanced Kwangyang BF know-how and recent developments like higher facilities reliability, optimum allotment of hot blast and oxygen, high sophisticated burden distribution control and special screening equipment of raw materials.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2004

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)