Hostname: page-component-586b7cd67f-g8jcs Total loading time: 0 Render date: 2024-11-28T08:40:27.050Z Has data issue: false hasContentIssue false

Improvement of the BOF process by use of a radar measurement at the Dillinger Hütte

Published online by Cambridge University Press:  25 October 2002

Get access

Abstract

In order to achieve comparatively constant BOF process data, a radar measurement equipment was installed at the two 185-t vessels at the Dillinger Hütte steelplant. The level of liquid steel in the converter is easily measured for every heat with a radar unit. With this installation, the distance between the tip of the oxygen blowing lance and the steel surface can be adjusted in accordance to process conditions. As a result, metallurgical and technological improvements were achieved, e.g. the Fe-content of the slag was reduced and the lime consumption could be lowered as well. A more uniform lining wear can be observed and the life of lance tips is increased.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2001

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)