Hostname: page-component-586b7cd67f-r5fsc Total loading time: 0 Render date: 2024-11-28T07:30:03.314Z Has data issue: false hasContentIssue false

Periodic and sequential preventive maintenance policies

Published online by Cambridge University Press:  14 July 2016

Toshio Nakagawa*
Affiliation:
Meijo University
*
Postal address: Meijo University, Department of Mathematics, Tenpaku-cho, Tenpaku-ku, Nagoya 468, Japan.

Abstract

This paper considers periodic and sequential preventive maintenance (PM) policies for the system with minimal repair at failure: the PM is done (i) at periodic times kx and (ii) at constant intervals xk (k = 1, 2, ···, N). The system has a different failure distribution between PM'S and is replaced at the Nth PM. The optimal policies which minimize the expected cost rates are discussed. The optimal x and N of periodic PM and {xk} of sequential PM are easily computed in a Weibull distribution case.

Type
Short Communications
Copyright
Copyright © Applied Probability Trust 1986 

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

[1] Barlow, R. E. and Hunter, L. C. (1960) Optimum preventive maintenance policies. Operat. Res. 9, 90100.Google Scholar
[2] Barlow, R. E. and Proschan, F. (1965) Mathematical Theory of Reliability. Wiley, New York.Google Scholar
[3] Nakagawa, T. (1980) A summary of imperfect preventive maintenance policies with minimal repair. R.A.I.R.O. Operat. Res. 14, 249255.Google Scholar
[4] Nakagawa, T. (1981) A summary of periodic replacement with minimal repair at failure. J. Operat. Res. Soc. Japan 24, 213227.Google Scholar
[5] Nakagawa, T. (1984) Optimal number of units for a parallel system. J. Appl. Prob. 21, 431436.Google Scholar