Published online by Cambridge University Press: 24 December 2009
This report aims to provide a summary of the status of our Antarctic Submillimetre Telescope (AST) project up to date. It is a very new project for Antarctic astronomy. Necessary prerequisites for a future deployment of a large size telescope infrastructure have been tested in years 2007 and 2008. The knowledge of the transmission, frost formation and temperature gradient were fundamental parameters before starting a feasibility study. The telescope specifications and requirements are currently discussed with the industrial partnership.