Hostname: page-component-586b7cd67f-rcrh6 Total loading time: 0 Render date: 2024-11-24T19:41:24.827Z Has data issue: false hasContentIssue false

Introduction of the Buddy Scheme to First Year Core Trainees (CT1s) in the West Midlands Deanery

Published online by Cambridge University Press:  20 June 2022

Amy Burlingham
Affiliation:
Coventry and Warwickshire Partnership NHS Trust, Coventry, United Kingdom
Louay Eltagy*
Affiliation:
Birmingham and Solihull Mental Health NHS Foundation Trust, Birmingham, United Kingdom
Hari Shanmugaratnam
Affiliation:
Black Country Healthcare NHS Foundation Trust, Wolverhampton, United Kingdom
*
*Presenting author.
Rights & Permissions [Opens in a new window]

Abstract

Core share and HTML view are not available for this content. However, as you have access to this content, a full PDF is available via the ‘Save PDF’ action button.
Aims

Following a reflective session in the Birmingham MRCPSYCH course organized by West Midlands Deanery, CT1s identified the need for an informal peer support mechanism that bridged the gap between what is expected of them and the challenges of adjusting to the training scheme. This need became even more apparent during the COVID-19 era. This led to the creation of the buddy scheme. The main aims of the scheme are to design and develop a sustainable mechanism by which core trainees in higher years can support their year 1 counterparts informally, ease the transition of CT1 trainees into training and eliminate obstacles to success and reduce the differential attainment that hinders international medical graduates’ (IMGs) outcomes.

Methods

The pilot phase started on August 2020. During this phase 3 trusts in the West Midlands were approached to share in the scheme. A fourth trust already had their own local buddy scheme. Only 1 trust shared in the process at the beginning and a second one joined later. The scheme was coordinated by the local Post Graduate Medical Education Departments in the respective trusts. All CT1s newly joining the training program were paired with a more experienced core trainee (CT2) who had their respective job the previous year. Next phase started in August 2021. During this phase all 3 trusts shared in the scheme from the beginning. A training session on the expectation from CT2s was conducted for them. A higher trainee was allocated to coordinate the process for each trust. CT2s were advised to meet their buddies at least once a month in the first 3 months.

Results

A total of 24 CT1s shared in the pilot phase. All of them found the training either good or very good. 57% of CT1s found the scheme helpful in easing the transition into training and made them more confident in fulfilling their role. Most of them communicated with their buddies 1–2 times in the pilot phase. In the second phase around 40 CT1s shared in the scheme. Around 80% of CT1s found the scheme helpful and recommended that it continues. There was more contact between buddies at this stage.

Conclusion

All trainees found it easy to approach their buddy and would consider becoming a buddy next year. The most discussed topics were portfolio, work-place based assessments, expectations of the day job and on-call duties, followed by exams and end of year assessments (ARCP).

Type
Quality Improvement
Creative Commons
Creative Common License - CCCreative Common License - BY
This is an Open Access article, distributed under the terms of the Creative Commons Attribution licence (https://creativecommons.org/licenses/by/4.0/), which permits unrestricted re-use, distribution, and reproduction in any medium, provided the original work is properly cited.
Copyright
Copyright © The Author(s), 2022. Published by Cambridge University Press on behalf of the Royal College of Psychiatrists
Submit a response

eLetters

No eLetters have been published for this article.