No CrossRef data available.
Published online by Cambridge University Press: 28 July 2016
The following problem constitutes a minor delay in ultimate production, yet considerable time and effort and manpower are duplicated at present in finding a practical solution to what is really a repetition of Drawing Office calculations.
The problem is that drawings calling up various machined fittings often lack any reference to “practical” measurements by which the operator, the toolmaker and the Inspection Department may ”set-out ” and check the work concerned.