Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by
Crossref.
Costa, O. L. V.
and
Davis, M. H. A.
1988.
Approximations for optimal stopping of a piecewise-deterministic process.
Mathematics of Control, Signals, and Systems,
Vol. 1,
Issue. 2,
p.
123.
Davis, M.H.A.
1989.
Necessary conditions for optimality in the control of piecewise-deterministic Markov processes.
p.
719.
Rishel, Raymond
1990.
Stochastic Models.
Vol. 2,
Issue. ,
p.
435.
Costa, O. L. V.
1990.
Stationary distributions for piecewise-deterministic Markov processes.
Journal of Applied Probability,
Vol. 27,
Issue. 01,
p.
60.
Ribeiro do Val, J.B.
and
Felix Salles, J.L.
1991.
Analysis and algorithm for the stochastic control problem of a production/storage system.
p.
477.
Boukas, K.
Haurie, A.
and
van Delft, Ch.
1991.
A turnpike improvement algorithm for piecewise deterministic control.
Optimal Control Applications and Methods,
Vol. 12,
Issue. 1,
p.
1.
Haurie, A.
and
Van Delft, Ch.
1991.
Turnpike properties for a class of piecewise deterministic systems arising in manufacturing flow control.
Annals of Operations Research,
Vol. 29,
Issue. 1,
p.
351.
Dempster, M.A.H.
and
Ye, J.J.
1992.
Necessary and sufficient optimality conditions for control of piecewise deterministic markov processes.
Stochastics and Stochastic Reports,
Vol. 40,
Issue. 3-4,
p.
125.
Gaimon, Cheryl
and
Singhal, Vinod
1992.
Flexibility and the choice of manufacturing facilities under short product life cycles.
European Journal of Operational Research,
Vol. 60,
Issue. 2,
p.
211.
Costa, O. L. V.
1993.
Discretizations for the average impulse control of piecewise deterministic processes.
Journal of Applied Probability,
Vol. 30,
Issue. 2,
p.
405.
Costa, O. L. V.
1993.
Discretizations for the average impulse control of piecewise deterministic processes.
Journal of Applied Probability,
Vol. 30,
Issue. 02,
p.
405.
Boukas, E. K.
Zhu, Q.
and
Zhang, Q.
1994.
Piecewise deterministic Markov process model for flexible manufacturing systems with preventive maintenance.
Journal of Optimization Theory and Applications,
Vol. 81,
Issue. 2,
p.
259.
Gaimon, Cheryl
and
Ho, Johnny C.
1994.
Uncertainty and the acquisition of capacity: A competitive analysis.
Computers & Operations Research,
Vol. 21,
Issue. 10,
p.
1073.
CHAOUCH, BEN A.
and
BUZACOTT, JOHN A.
1994.
THE EFFECTS OF LEAD TIME ON PLANT TIMING AND SIZE.
Production and Operations Management,
Vol. 3,
Issue. 1,
p.
38.
Sethi, S.P.
Taksar, M.
and
Zhang, Q.
1995.
Hierarchical capacity expansion and production planning decisions in stochastic manufacturing systems.
Journal of Operations Management,
Vol. 12,
Issue. 3-4,
p.
331.
Monticino, Michael
and
Weisinger, James
1995.
Optimal cutoff strategies in capacity expansion problems.
Naval Research Logistics,
Vol. 42,
Issue. 7,
p.
1021.
Arntzen, Halvard
1995.
Optimal choice of production capacity in a random market.
Stochastics and Stochastic Reports,
Vol. 55,
Issue. 1-2,
p.
87.
Ierapetritou, M.G.
Pistikopoulos, E.N.
and
Floudas, C.A.
1996.
Operational planning under uncertainty.
Computers & Chemical Engineering,
Vol. 20,
Issue. 12,
p.
1499.
Eberly, Janice C.
and
Van Mieghem, Jan A.
1997.
Multi-factor Dynamic Investment under Uncertainty.
Journal of Economic Theory,
Vol. 75,
Issue. 2,
p.
345.
Schäl, Manfred
1998.
On piecewise deterministic Markov control processes: Control of jumps and of risk processes in insurance.
Insurance: Mathematics and Economics,
Vol. 22,
Issue. 1,
p.
75.