Published online by Cambridge University Press: 05 March 2024
The crisis in the supply of Naval ship timber in 1803–04 was the result of two related pressures. The first was the expansion of British Naval commitments after war with France was renewed in May 1803. The British fleet then comprised approximately 608 ships of all sizes, 81 of them being 74-gun ships, the backbone of the line of battle. By 1813 there were a total of 899 ships, 143 of them 74s. The victory at Trafalgar did not eliminate wearisome, wearing blockade of enemy ports and the very success of the Navy increased its tasks. Defeated at sea, French imperial power expanded dramatically on land. From 1806 the introduction of Napoleon's Continental System, his determination to outbuild Britain by sea and, after 1812, a war with the United States of America, imposed fresh duties calling for more ships. To meet these commitments and retain British Naval dominance, a regular, reliable and, if possible, reasonably priced supply of ship timber was essential and was becoming more difficult to acquire.
In 1801 the annual timber consumption in the royal dockyards was over 36,000 loads. After 1803 it rose to 53,000 loads, in 1812 it had reached 74,000 loads, and although this figure fell with peace, it fell only to the figure for about 1803. After 1815 Britain was concerned to maintain a navy of a two-power standard against France and Russia and old 74s were replaced by 80-gun ships, heavier, longer, more powerful and consuming more timber. Yet defence costs were being reduced in deference to peace and Naval estimates were fixed at approximately £6 million annually until 1830.
The standard unit of measurement for ship timber was the load, of between 40 and 50 cubic feet. The average oak of ship timber size contained approximately one such load and provided, approximately, a ton of shipping. An average 74-gun ship, between 1,600 and 1,900 tons, required about 3,000 loads of timber, mainly oak but also elm, beech, ash and fir, and was built at an approximate total cost of £60,000, of which about £35,000 represented hull timber. The masts and yards cost an additional £3,000–4,000.
The royal forests could only supply a fraction of the Navy's needs, approximately 4,000 loads annually.
To save this book to your Kindle, first ensure [email protected] is added to your Approved Personal Document E-mail List under your Personal Document Settings on the Manage Your Content and Devices page of your Amazon account. Then enter the ‘name’ part of your Kindle email address below. Find out more about saving to your Kindle.
Note you can select to save to either the @free.kindle.com or @kindle.com variations. ‘@free.kindle.com’ emails are free but can only be saved to your device when it is connected to wi-fi. ‘@kindle.com’ emails can be delivered even when you are not connected to wi-fi, but note that service fees apply.
Find out more about the Kindle Personal Document Service.
To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Dropbox.
To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Google Drive.