Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by
Crossref.
Benoist, Thierry
Jeanjean, Antoine
and
Molin, Pascal
2009.
Minimum Formwork Stock problem on residential buildings construction sites.
4OR,
Vol. 7,
Issue. 3,
p.
275.
Walter, Matthias
and
Zimmermann, Jürgen
2016.
Minimizing average project team size given multi-skilled workers with heterogeneous skill levels.
Computers & Operations Research,
Vol. 70,
Issue. ,
p.
163.
Biruk, Slawomir
and
Jaskowski, Piotr
2017.
Optimization of Vertical Formwork Layout Plans Using Mixed Integer Linear Programming.
International Journal of Civil Engineering,
Vol. 15,
Issue. 2,
p.
125.
Song, Yanjie
Huang, Danjie
Zhou, Ziyu
and
Chen, Yingwu
2018.
An emergency task autonomous planning method of agile imaging satellite.
EURASIP Journal on Image and Video Processing,
Vol. 2018,
Issue. 1,
Ko, Chien-Ho
and
Kuo, Jiun-De
2019.
Making Formwork Design Lean.
Journal of Engineering, Project, and Production Management,
Vol. 9,
Issue. 1,
p.
29.
Martínez, Carlos A.
Díaz, Juan F.
and
Duque, Robinson
2019.
Diseño del encofrado para muros usando encofrados modulares.
TecnoLógicas,
Vol. 22,
Issue. ,
p.
1.
Han, Lei
Tu, Chunyu
Yu, Zhiyong
Huang, Fangwan
Guo, Wenzhong
Chen, Chao
Yu, Zhiwen
and
Liu, Han
2022.
Minimizing the Cost of Spatiotemporal Searches Based on Reinforcement Learning with Probabilistic States.
Wireless Communications and Mobile Computing,
Vol. 2022,
Issue. ,
p.
1.