563 Optimize efficiency in clinical trial development by assessing and forecasting operationally associated risks utilizing REDCap
Published online by Cambridge University Press: 11 April 2025
Abstract
Objectives/Goals: Mayo Clinic Florida’s Clinical Research Units develop over 200 clinical studies on average annually. Almost 30% of these projects are developed and then are unable to activate due to a variety of operational factors. To increase the success rate, a scoring tool was created to assess the risk associated with the development of these research projects. Methods/Study Population: A project team comprised of members of research administration and physician leadership developed a rapid project management (RPM) scoring tool to assess operational risk factors. The scoring algorithm was embedded into an existing REDCap database, using a combination of identified variables and calculated fields. All noncancer industry sponsor-initiated clinical studies were scored at intake. According to the following categories: enrollment timelines, study team capacity, and previous experience with the Sponsor. Studies with a score greater than the established threshold were referred to physician leadership for transparent discussions with the principal investigator regarding the identified study development-related risks. Results/Anticipated Results: The RPM tool has assessed close to 200 projects since implementation in June 2022. An interim analysis is being conducted of all projects assessed by the RPM tool dating from implementation to May 2024 to compare the outcomes of these studies with the given RPM score. We anticipate based on anecdotal evidence gathered during the course of this pilot project that the RPM tool will show a correlation between risks identified and study outcomes as defined as successful activation of trials, or rationale of project development failures. We anticipate a reduction in the amount of time elapsed and effort expended developing projects with scores reflecting identified project development-related risk factors. Discussion/Significance of Impact: The RPM tool provides an opportunity to allocate resources to studies with the greatest potential for successful activation. In the future, the RPM tool may be used to identify risk factors associated with enrollment and accrual of participants.
- Type
- Research Management, Operations, and Administration
- Information
- Creative Commons
- This is an Open Access article, distributed under the terms of the Creative Commons Attribution-NonCommercial-NoDerivatives licence (https://creativecommons.org/licenses/by-nc-nd/4.0/), which permits non-commercial re-use, distribution, and reproduction in any medium, provided the original work is unaltered and is properly cited. The written permission of Cambridge University Press must be obtained for commercial re-use or in order to create a derivative work.
- Copyright
- © The Author(s), 2025. The Association for Clinical and Translational Science